Academy receives traditional looking building in just 11 weeks from Wernick Buildings

Latest News Tue, Mar 22, 2016 5:01 PM

Academy receives traditional looking building in just 11 weeks from Wernick Buildings

Wernick Buildings were selected to build the new classroom facility after a competitive tendering procurement process by the Academy for their rapidly expanding 6th form intake.

Janine Tuck, who is the Facilities Manager at Langley Academy commented: “When I received all the tenders back for the new proposed facility, I was surprised at the speed of which the project could be finished by Wernick Buildings. We are a very busy Academy and minimal disruption to our site is important for all our Students and Staff”.

The newly constructed classroom facility comprises of three individual class rooms which have been designed with the flexibility of being converted into one large assembly room. This is achieved with specially designed fold-away partitions which provide an exceptional 48db sound proof rating. The inside to the facility has a full suspended ceiling grid throughout which is complemented by a high standard of internal finishes and the latest state of the art IT equipment. The facility externally features a visually pleasing finish of real brick and render, which is fully complimented with a 22.5 degree traditional tiled Dutch barn roof which matches the existing neighboring building.

Janine was very happy with the fast track build provided by Wernick. She commented, “Communication with the Wernick team from start to finish was excellent and any issues arising were dealt with promptly, I am totally impressed of how the finished building looks ‘just like a traditional looking building’. Wernick offered a 14 week Programme however; they achieved the whole project in just 11 weeks. Our whole experience of engaging Wernick Buildings to deliver our new facility was exceptional and most importantly for us - on budget”.

At a glance:
Client: Langley Academy, Slough Borough
Facility Requirement: Expanding 6th form Classroom Block
Project type: Educational ‘Full Turnkey Supply’ - Wernick Buildings Ltd (Main Contractor)
Facility consists of: Three Classrooms, Male & Female Toilets, Office, unisex Shower, IT room, Large Achieve store, and substantial circulation corridor.

Featured News

Specification news
Creation LVT … Create Without Limits … Create with...

The NEW 2026 Creation LVT Collection is meticulously inspired by the latest interior...

Read More >>

Specification news
Design That Stands on Its Own

Proven stability for creative bathroom concepts beyond the heavy and the ordinary:...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Fireboard Product Sheet Brochure

Fireboard Product Sh...
By Marmox (UK) Ltd

Download Now >>

Fireboard/Multiboard Brochure Brochure

Fireboard/Multiboard...
By Marmox (UK) Ltd

Download Now >>

Multiboard (Basins) Product Sheet Brochure

Multiboard (Basins)...
By Marmox (UK) Ltd

Download Now >>

Multiboard (Niche) Product Sheet Brochure

Multiboard (Niche) P...
By Marmox (UK) Ltd

Download Now >>

Multiboard (Showerlay) Product Sheet Brochure

Multiboard (Showerla...
By Marmox (UK) Ltd

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Motiva Expanse™
Motiva Expanse™

The Motiva Expanse™ is our multifunctional, fully enclosed, cost-effective alternative to a...

Read More >>

Motiva Vista™
Motiva Vista™

The Motiva Vista™ is the latest addition to our wide range of canopy solutions. The Motiva...

Read More >>

Motiva Linear™
Motiva Linear™

The ‘Linear’ is our monopitch (asymmetric) straight roof variant - this is where one side is...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs
The UK's No 1 Pool, Spa and Wellness Show – SPATEX 30 secs

And there’s a chance to do it all over again when the BIG 30th anniversary edition of SPATEX 2026...

Watch Now >>

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>