Latest News Tue, Mar 22, 2016 5:25 PM
Brett Landscaping has successfully enabled a Headmaster with a side-line flair for design to pave his own success, by creating and implementing the installation of an impressive 3,000 sq m of road and footpath paving using Brett materials at Chase Grammar School in Cannock.
The paving project at Chase Grammar, which academically is among the top 16 independent schools in the country, has been executed to improve the school’s previously tarmacked front grounds to better accommodate its expanding pupil intake - which has nearly tripled in recent years.
School Head of 17 years and former engineer Mark Ellse used his previous career experience to oversee the complete design, supply, modification and completion of the project. This incorporates Brett block paving to create an attractive hard landscaped footpath area, with the further addition of a reinforced road to complement the pedestrian paving.
Architectural practice, J. Mason Associates of Cannock, supplied site plans for the project, which combined the paving with an attractive landscaped vista. Effective drainage was essential to the paving scheme’s design; so graduating slopes leading to a central flower bed containing pin oak and landscaped side beds were incorporated within the design for rainwater from upper areas to flow into.
The choice to select Brett as the project’s supplier was made from a recommendation by builders’ merchant Ranton Building Supplies, as well as Mark’s own ground-level research of other suppliers’ installations in the locality, which confirmed the aesthetic and functional qualities of the Brett range.
Mark selected Brett’s classic Omega rectangular block, and the homely feel of tumbled Alpha Antique in Autumn gold to deliver the right practical and visual solution. This combination successfully divides the space and offering contrast, while also providing traffic guidance.
The paving has been supplied in 60mm for pedestrian, and the thicker 80mm for roads to withstand the greater vehicular pressure. To minimise disruption, the installation has been phased to tie in with the school calendar so the final sections are still to be installed.
Featured News
A bold reinvention of a Grade II-listed office building on London’s South Bank has...
The Royal Institute of British Architects (RIBA) has launched a taskforce of leading...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
HPS200 Ultra Case St...
By Tata Steel
Confidex Datasheet
By Tata Steel
Prisma UK 2024
By Tata Steel
HPS200 Ultra UK
By Tata Steel
Amtico Bio Support D...
By Amtico
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...
Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...
Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...