RADMAT RETURNS GUY’S TOWER ROOF TO FULL HEALTH

Latest News Tue, Mar 22, 2016 5:40 PM

RADMAT RETURNS GUY’S TOWER ROOF TO FULL HEALTH

In its challenging city-centre location, Guy’s Tower has undergone a huge refurbishment with the ageing 143m building upgraded to current performance, environmental and aesthetic standards. Overcoming a series of unique on-site challenges – including working at height in a live hospital environment – Radmat Building Products Approved Contractor Richardson Roofing installed more than 1,000m2 of high performance roofing membranes to help bring the landmark building back to its best.
                          
Originally founded in 1721, the hospital built the 34 storey Guy's Tower in 1974.  When a feasibility study commissioned by Guy’s and St Thomas’ NHS Foundation Trust in 2008 revealed severe deterioration of its concrete facade, failing windows and poor environmental performance, a comprehensive refurbishment was deemed the safest and most cost-effective solution.
 
Designed by architects Penoyre and Prasad and delivered by Balfour Beatty, the £26 million refurbishment included the application of new cladding and glazing systems, and thermal upgrade and waterproofing  of a 45° pitched roof and a series of inverted terraces. Balfour Beatty also required an innovative environmentally friendly solution that would deliver the thermal performance required whilst ensuring health and safety of operatives and members of the public were covered.
 
With safety absolutely paramount across the development, Radmat’s Esha range of membranes proved the perfect solution minimising material cost, application time and waste disposals.  The use of Esha systems also enabled Radmat Approved Contractor Richardson Roofing to meet Balfour Beatty’s highest safety standards in line with its Zero Harm Vision.
 
 
For the asphalt covered sloping roof on the 34th floor, EshaUniversal waterproofing was specified with ProTherm PIR (polyisocyanurate) insulation as part of a complete Radmat roofing system.  Made from recycled materials and 100% recyclable – EshaUniversal offered a simple application and the required performance to meet the demands of this complex and sustainable refurbishment.
 
Offering an efficient and safe installation, a 2mm thick EshaBase SA Alu self-adhesive vapour control layer was adhered directly to the existing asphalt using Esha SA Primer.  Due to the wind loading 142m above London, the 120mm thick ProTherm PIR insulation was mechanically fixed to the deck using Radmat ProFast fixings, prior to the mechanical fastening of the EshaUniversal single layer membrane.  The resulting roof achieved current Approved Document L requirements for thermal performance. Low level flat roof areas were also covered with the same specification to provide an assurance of trouble free performance for many years to come.
 
On the inverted roofs, on levels 34 and 31, asbestos tiles were safely removed, and the asphalt was overlaid with two layers of Radmat’s EshaGum 3mm reinforced bitumen membrane. The existing asphalt surface was prepared to ensure no defects or blisters across the entire application prior to the installation of the EshaGum, with a 200mm thick Radmat ProTherm inverted roof insulation board installed to upgrade the roof’s thermal performance.  Completing the installation was the application of paving slabs on spacers resulting in a series of terraces that now meet the thermal performance requirements of Part L of the Building Regulations.
 
Despite the complex refurbishment presenting a number of challenges on-site, the high quality and innovative roofing solutions from Radmat and Richardson Roofing helped to keep the landmark refurbishment on course for its 2014 completion. The company’s range of safe, economical and sustainable roofing solutions proved ideal for this landmark project where long term energy efficiency was key to its success.

Featured News

Specification news
CIBSE announces 2025 Building Performance Awards...

CIBSE announced the shortlist at the close of day one at CIBSE Build2Perform Live...

Read More >>

Specification news
ASFP launches new passive fire protection Level 2 Award...

The Association for Specialist Fire Protection (ASFP) has announced the launch of its...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>