Public Sector Tue, Mar 22, 2016 5:14 PM
The energy efficient lighting solution installed by Dextra Lighting at the Gold Corner Pumping Station, which sits on the Huntspill River in Somerset, has saved the Environment Agency in excess of £2,000 per annum in reduced energy usage.
It has also created a much more effective LED office lighting and industrial LED lighting solution, with increased lux levels across all areas of the site.
Throughout the pumping station you will find Dextra Lighting’s high performing Hydra LED luminaires, which being fully rated to IP65 are suitable for both internal industrial LED lighting and exterior LED lighting applications.
The Hydra LED is one of a number of LED ceiling lighting products that utilise the latest LED LINE cards from Philips. The highly efficient LED LINE card allows Dextra Lighting to offer this luminaire in a wide range of lumen outputs with light output ratios in excess of 80% combined with a 50,000 hour lifetime and 5 year warranty.
Within the offices Dextra Lighting have introduced yet another energy efficient LED lighting solution, the Graduate LED. A functional LED office lighting solution, the GRD LED has introduced increased lux levels for a much improved working environment when compared with the 2x70W T8 battens which previously lit the entire site.
The GRD LED has been modelled upon the success of its fluorescent equivalent but offers the added benefits of excellent energy efficiency and a 50,000 hour lifetime.
Manufactured using Philips LED cards and driver, this new internal LED lighting solution has been designed to incorporate an optional integral microwave sensor offering presence detection and brightout control, further increasing its credentials as an energy efficient lighting alternative. The Graduate LED is ideal for retrofit applications, allowing sensor control without the cost associated with modifying external wiring.
Tony Daw from the Environment Agency, the public body responsible for managing the Gold Corner Pumping Station, is so pleased with this internal LED lighting solution that he has requested Dextra Lighting supply an exterior LED lighting scheme to cover all external areas of the site.
Dextra Lighting’s range of exterior LED lighting and LED flood lighting products will hopefully be seen lighting the outside of the Gold Corner Pumping Station very soon.
Featured News
Forbo Flooring Systems has renewed its Eternal collection of general purpose vinyl,...
Leading specialist trade supplier IronmongeryDirect has expanded its Jigtech door...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
A&S Landscape - Bump...
By A&S Landscape
A&S Landscape - Cont...
By A&S Landscape
A&S Landscape - 2025
By A&S Landscape
Retirement & Care
By AKW
Kitchens
By AKW
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
The Nurture Range provides child-friendly, durable 12mm SGL washroom solutions for nurseries and...
Triumph Privacy offers enhanced privacy while maintaining the sleek aesthetic of the Triumph range....
Elevate cubicles offer enhanced height and privacy for superior comfort and security. Durable nickel...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...