Metal Technology Systems Installed on School Building of the Year.

Latest News Tue, Mar 22, 2016 5:34 PM

Metal Technology Systems Installed on School Building of the Year.

Metal Technology has completed work at "School Building of the Year" Hillview School for Girls, Kent with main contractor Galliford Try.

Constructed under Galliford Try's Optimum School initiative, the new science block uses the best available technology and efficiencies, with standardisation of key components, off-site manufacturing and intelligent design.

Through the existing supply chain partnership, Metal Technology was invited to present a cost effective glazing solution that was suitable for both on and off site construction.

In order to provide the free air required to meet the building's natural ventilation strategy while keeping to the output design of a glazed panel next to a louvre, Metal Technology supplied the 5-20 window system. An inward opening, tilt -before- turn vent behind a fixed blade louvre in combination with a top hung casement allows each room's natural ventilation needs to be managed individually. The tilt mode offers reduced ventilation while the option to open the vent fully in the turn mode offers instant ventilation.

For consistency with the external design, Metal Technology's P50 System 23 Louvre was fitted to the exterior. The P50 Louvre has been barrier load tested and was critical in the design as it provides safety at first floor level when the tilt turn vent is fully opened in the turn mode. The result is a window with a flush appearance on the inside and out and the re-engineered design process presented an overall saving on the glazing package of approximately £20,000.

Featured News

Specification news
Hill Station - architecture and the altitudes of Empire

New RIBA exhibition spotlights how the city of Freetown, Sierra Leone, was shaped by...

Read More >>

Specification news
New trade measures to support steel sector

Steel producers across the UK will benefit from stronger trade measures from 1 July,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>