On site accommodation for £90m scheme

Regeneration Tue, Mar 22, 2016 5:29 PM

On site accommodation for £90m scheme

AV Group’s hire team is in high spirits this week following the completion of a major on-site accommodation installation for McLaren Construction in Bromley.

McLaren has been appointed by Cathedral (Bromley) Limited to build the £90m mixed use regeneration scheme which will transform Bromley town centre.

Commenting on the scheme AV Group project manager John Roper said: "We've worked with McLaren on many projects before and were delighted to be instructed once again to provide top of the range site accommodation for its contractors and sub-contractors. We had a much smaller triple stack on site when work began six months ago but, with up to 450 contractors on site at peak times, McLaren really needed a much larger facility. We have built from new half of the units and supplemented the remainder from our existing fleet.

"We have installed 18 units in total giving a 454 m2 of space and, to make best use of the space on site, we have double or triple stacked units. The induction unit on the ground floor has a large platform on top which gives access to the second floor. The building will provide the workforce with all of its welfare facilities including a canteen, changing rooms, showers, toilets, drying room and recreational space as well as offices, a reception room, a computer room and meeting rooms for the company. Externally we have included a viewing gantry so people can observe the progress of the development across the site."

Access was particularly tricky, which is something the team is quite used to, and the team used five different cranes to lift the buildings into place. John added: "The entrance to the site is right on a junction with traffic lights so we needed to get the units lifted quickly into place. As we ran out of space to manoeuver we reduced the size of the crane from 50 tonne to 25 tonne. We were then also hampered by the recent high winds so it certainly had its challenges to get everything in place in just one week."

AV Group's buildings will be on-site with McLaren for the duration of the build which is estimated for completion in late 2015.  When completed the scheme will provide Bromley with a new residential and leisure quarter with cinema, public open spaces, restaurants, a 130-bedroom hotel and 200 private and affordable apartments and a 400 space underground car park.

Featured News

Specification news
Kalzip launches EasyFalz by Kalzip - a new premium...

Kalzip has launched EasyFalz by Kalzip, a new premium range of metal roofing and...

Read More >>

Specification news
Rethinking the outdoors: How shifting routines are...

As active lifestyles and remote working redefine daily routines, demand for green...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>