Latest News Tue, Mar 22, 2016 5:21 PM
At Fordingbridge we can deliver a Sustainable Pre-engineered Classroom (SPEC) in just 16 weeks from concept to completion. This permanent solution offers a quality energy-efficient teaching environment compared to the cheaper temporary options available today. Our construction time is quick and efficient, causing minimal disruption to the school day and carried out by a CRB-checked installation team; a full health and safety compliance/accreditation is integral to our service.
Our SPEC building provides:
• an inspiring multi-use space designed to be flexible and versatile
• a permanent solution with a long lifespan, not a temporary fix
• sustainable, energy-efficient and cost-effective accommodation
• low maintenance and low running costs
Special features come as standard with a Fordingbridge SPEC classroom, including:
Timber frame: our FSC-certified curved timber frame is carbon neutral and gives a warm yet contemporary feel
Super insulation: a ‘fabric first’ approach means our insulation value is 40% better than building regulations require, reducing your energy requirements all year round
Air tightness: conserves heat, minimises draughts and cold air infiltration, reducing your energy bills
Intelligent lighting system: alters in conjunction with the outside light levels to ensure the correct lighting environment
Green roof: our attractive wildflower meadow roof is an optional extra that slows rainwater runoff, attenuates exterior noises and provides additional insulation
Acoustic design: built in to exceed relevant standards
Underfloor heating: provides even heating with very low energy demand to save running costs and eliminates hot-touch, space-consuming radiators
Air sourced heat pump: absorbs energy from the air outside and transfers it to an insulated solid floor
Thermal mass: prevents overheating in summer and stores warmth in winter; the underfloor pipes giving very low running costs; no need for gas connections or oil tanks
Our SPEC building is designed with multi-purpose use and flexibility of space in mind, offering a fully DDA compliant 30-pupil classroom, entrance lobby, storage area and adequate toilet facilities as shown in the floorplan.
Our proven high-quality construction methodology is built on 20 years of experience in the education sector. Contact us to arrange a no-obligation FREE site visit and consultation at www.fordingbridge.co.uk.
Featured News
Major reforms of the UK's planning system, mortgage market and property tax regime...
The new Labour Government has set out a range of ambitious plans during its first 100...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Novantica - Cement F...
By Fassa Bortolo
Fassatherm System -...
By Fassa Bortolo
Fassarend System - P...
By Fassa Bortolo
Fassalime System - P...
By Fassa Bortolo
Sport England’s Perf...
By Passivent
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London