Balfour Beatty tops out Chamberlain Student Residence

Public Sector Wed, Mar 23, 2016 9:11 AM

Balfour Beatty tops out Chamberlain Student Residence

Balfour Beatty has been joined by its customer, the University of Birmingham, for the topping out of the 21-storey Chamberlain Student Residence which has reached its highest point of construction, ahead of opening its doors to students this autumn.

Friends and neighbours of the University were among guests who travelled to the roof of the building in Edgbaston to see Vice-Chancellor, Professor Sir David Eastwood, lay the final area of concrete at the top.

Balfour Beatty is delivering the project in just 103 weeks by utilising BIM (building information modelling) for the planning and value-engineering of the project and the expertise of Balfour Beatty Engineering Services and its Modular Systems+ facility in Wednesbury to provide bespoke pre-fabricated modular mechanical and electrical units housing ducting, cabling and pipe-work for the building. These can be installed quickly on-site further reducing the construction time.

The building will meet the highest government-approved EPC ‘A’ category for energy efficiency through the use of brick cladding for insulation, a CHP (combined heat and power) plant, LED lighting, a copper rainscreen and glazed curtain walling to reduce heat loss.

The building, which rises around 75m from ground level, will be home to more than 700 first year students at the university from this September, replacing the previous Eden Tower which closed in 2006.

Lesley Stewart, Director of Residential and Environmental Services at the university, said: “We have an on-going commitment to invest in our accommodation stock to ensure that students coming to Birmingham have outstanding homes to live in, to get their university lives off to a flying start.

“The redevelopment of Chamberlain is the latest project to come to fruition after many years of hard work to get it to this stage and I am delighted that we have reached this important point. The tower looks wonderful and I look forward to welcoming the first residents of the new Chamberlain this autumn.”

Colin Harper, Balfour Beatty Project Director, said: “Today marks an important milestone in the construction of the new Chamberlain student residences. We look forward to continuing to work with the University of Birmingham and local community to deliver this state-of-the-art residence for students.”

Also at the ceremony was third year civil engineering student George Bence. George recently completed a placement on site for Balfour Beatty at Chamberlain Halls, giving him valuable real-life experience of working on a construction site.

He said: “On day one I realised I had no idea how a site worked. Now, thanks to the brilliant team I worked with on site, I am able to make a positive contribution. Having watched construction begin, and the tower rise out of the ground, it’s great to see it reach this milestone.”

Featured News

Specification news
IronmongeryDirect expands its Jigtech offering

Leading specialist trade supplier IronmongeryDirect has expanded its Jigtech door...

Read More >>

Specification news
Gatic UltraSlot takes on massive port expansion at...

The Port of Huelva in Andalusia has undergone a €40 million expansion, which saw...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Rearo Tradeline Brochure

Rearo Tradeline
By Rearo

Download Now >>

Rearo Sustainability Plan Brochure

Rearo Sustainability...
By Rearo

Download Now >>

Rearo Stericlad Brochure

Rearo Stericlad
By Rearo

Download Now >>

A&S Landscape - Bumper Newsletter Brochure

A&S Landscape - Bump...
By A&S Landscape

Download Now >>

A&S Landscape - Contractors Brochure

A&S Landscape - Cont...
By A&S Landscape

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

NURTURE EARLY YEARS CUBICLES
NURTURE EARLY YEARS CUBICLES

The Nurture Range provides child-friendly, durable 12mm SGL washroom solutions for nurseries and...

Read More >>

Triumph Custom-fit Cubicles For The Most Sophisticated Spaces
Triumph Custom-fit Cubicles For The Most Sophisticated Spaces

Triumph Privacy offers enhanced privacy while maintaining the sleek aesthetic of the Triumph range....

Read More >>

ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION
ELEVATE CUSTOM-FIT CUBICLES WITH A PRIVACY OPTION

Elevate cubicles offer enhanced height and privacy for superior comfort and security. Durable nickel...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>