Barr Construction installs 106m roof truss at Ashton Gate rebuild

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:11 AM

Barr Construction installs 106m roof truss at Ashton Gate rebuild

Leading UK construction firm Barr Construction took a big stride forward with the Ashton Gate rebuild successfully lifting the 106m Dolman Stand roof truss into place.

Weighing 75 tonnes, the roof extension was built at ground level over the past few weeks before two 200 tonnes cranes were used to lift the steel truss into place.

The lifting of the roof truss is one of the most complicated part of the £45 million rebuild of Bristol City and Bristol Rugby’s ground to-date.

Mike Henderson, operations manager for Barr Construction said: “Today has been a landmark event. The design has had to take in a lot of difficult parameters. From working with the existing Dolman roof to the new South Stand, we’ve had to work to tight tolerances of 10mm at each end of the truss.  

“When you consider that it is 106 metres long and weighs 75 tonnes it’s not an easy piece of steel to slot in to place, but it was a momentous occasion to see that it has today.”

Bristol Sport chairman, Martin Griffiths said: “It’s been a big week for the stadium. Last Wednesday we saw the gap close in the South Stand and seating being fitted, today the lift of the Dolman roof truss. It was quite an incredible feat of engineering to see it slot seamlessly into place.  

“Fans coming to this weekend’s games at Ashton Gate will really start to get a sense of what this stadium is going to become.”

Barr construction has been on site since July last year. Phase One consisted of the demolition and rebuild of the South Stand with Phase Two seeing the Dolman Stand remodelled to include an extended roof and new lower tier.  

Phase Three will start this summer and see the Williams stand demolished and replaced with a two-tier stand that will hold 11,000 people.

Featured News

Specification news
Setting the standard for large-scale solid surface...

In the demanding world of commercial construction and renovation, where deadlines are...

Read More >>

Specification news
Hotel specifies Dorma Huppe moveable walls

Partitioning expert, Style was recently contracted to work with architects, Jestico &...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

Amtico Access Brochure

Amtico Access
By Amtico

Download Now >>

Amtico Acoustic Brochure

Amtico Acoustic
By Amtico

Download Now >>

Amtico Click Smart Brochure

Amtico Click Smart
By Amtico

Download Now >>

Amtico Decor Brochure

Amtico Decor
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Hardie® Plank
Hardie® Plank

James Hardie fibre cement products are built to last. It's the go to façade for builders,...

Read More >>

Hardie® Panel

With James Hardie, It’s Possible™If you're looking for a high performance, A2 fire-rated façade...

Read More >>

Hardie® Backer
Hardie® Backer

With James Hardie, It’s Possible™Moisture sensitive areas like kitchens and bathrooms are...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>