UTC Reading is a University Technical College that offers computer science and engineering courses to up to 600 students, aged 14-19 years.
In common with most large commercial buildings, the college is provided with cold water from the rising main via a ground-floor tank which guarantees an uninterrupted supply of drinking quality water whatever the demands placed on it by its many occupants.
The water tank at UTC Reading is divided into two chambers to allow easy maintenance and cleaning while still ensuring an uninterrupted supply of water to the building. However, a divided tank has to be carefully managed; both sides of the tank need to fill with water at the same rate from the rising main to ensure neither side becomes ‘static’ as this could lead to bacterial growth and stagnant water.
At UTC Reading, the water within a divided tank was controlled by two independent equilibrium valves which were not working simultaneously, thus one side of the tank filled and emptied faster than the other side – the latter was in danger of becoming static.
M&E contractors LJJ Ltd turned to Keraflo for a solution that would not only guarantee the safety of the water, but would also deliver a highly flexible supply within the building. The decision was made to install Tanktronic (TT43 and TT15) as the preferred option for both managing water quality and to act as valves, controlling the water influx into both sides of the tank.
Tanktronic is an electronic tank management system which provides a complete solution to managing and controlling tank filling, as well as monitoring/reporting water levels and temperature.
Where required, it can be integrated into a building management system to alert the management team to any changes in the stored water. It also has a very useful calendar (holiday) setting so that the building management team can vary tank capacity to match demand.
Its smart functionality includes a Repeater Panel, which enables control from up to 100 metres away (meaning tanks housed in basements or roofs can be controlled from the comfort of the management office) and the Battery Module, which provides up to two days of normal operation in the event of a power failure. Having been launched three years ago, Tanktronic is already installed in many prominent buildings including The O2 Arena in London.
Philip Eykel, Operations Director of LLJ Ltd says: “We were very pleased with the service provided by the Keraflo team. Their technical support was fantastic, installation was easy and the team was onsite to ensure everything went smoothly.”
For more information call 0118 921 9920, email info@keraflo.co.uk or visit www.keraflo.co.uk.
Featured News
The Defence Infrastructure Organisation (DIO) and the Royal Navy have concluded a...
NBS (powered by Hubexo) has revealed further findings from its ‘Sustainable...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Novantica - Cement F...
By Fassa Bortolo
Fassatherm System -...
By Fassa Bortolo
Fassarend System - P...
By Fassa Bortolo
Fassalime System - P...
By Fassa Bortolo
Sport England’s Perf...
By Passivent
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London