Innovaré Systems completes work on phase one of One Housing Group’s £22.5m scheme

Housing Wed, Mar 23, 2016 10:24 AM

Innovaré Systems completes work on phase one of One Housing  Group’s £22.5m scheme

Innovaré Systems, one of the UK’s leading providers of structural insulated panel systems (SIPs), has completed work on the first phase of the £22.5 million redevelopment of One Housing Group’s Kidwells Estate in the centre of Maidenhead.

The new development, which is currently being constructed by Wates Living Space, replaces 1960s-built apartment blocks and will provide a total 204 new high quality homes, including 75 homes for affordable rent, nine for shared ownership and 120 for private sale.

The new blocks, varying from three to six storeys, will provide three and four bedroom family homes as well as one and two bedroom apartments. Residents will also benefit from new outdoor communal areas such as an area for social activities and landscaped gardens.

Pete Blunt, Managing Director of Innovaré Systems said: “The project was originally specified with air source heat pumps which are hugely expensive in terms of procurement, installation and on-going running costs. By using i-SIPs instead, Wates was able to provide a more conventional heating system through the use of boilers and radiators, and as a result, the project is more competitively priced, yet still achieves the performance required to reduce energy costs for residents.”

Construction work is being carried out over four phases to minimise disruption to existing residents. Phase one is due for completion in April 2013 and will provide 84 new homes for residents, with final completion scheduled for 2015.

Featured News

Specification news
An Outlook on Social Housing

IVC Commercial has published its outlook on vinyl flooring for social housing...

Read More >>

Specification news
‘Logic Air heat pumps are the perfect solution for...

At a prestigious development in Chippenham, Wiltshire, Redcliffe Homes is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

HPS200 Ultra Case Study Brochure Brochure

HPS200 Ultra Case St...
By Tata Steel

Download Now >>

Confidex Datasheet Brochure

Confidex Datasheet
By Tata Steel

Download Now >>

Prisma UK 2024 Brochure

Prisma UK 2024
By Tata Steel

Download Now >>

HPS200 Ultra UK Brochure

HPS200 Ultra UK
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

​The Confidex® Guarantee
​The Confidex® Guarantee

Offers the most comprehensive guarantee for pre-finished steel products in Europe and provides peace...

Read More >>

Colorcoat HPS200 Ultra®
Colorcoat HPS200 Ultra®

Colorcoat HPS200 Ultra®Super durable guaranteed performance.Designed to withstand even the most...

Read More >>

Prisma
Prisma

Colorcoat Prisma®Aesthetics that last, guaranteed.Colorcoat Prisma® demonstrates a step change by...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>