Planning system on the brink due to lack of resource

Housing Wed, Mar 23, 2016 10:39 AM

Planning system on the brink due to lack of resource

Some of England’s major cities are taking well over six months to determine major new planning applications with both developers and local authorities identifying a lack of resource within planning departments as a key barrier to development.

The majority of developers believe higher planning fees might be part of a potential solution, helping local authorities shorten waiting times and improve performance.

The average submission to determination time for a major planning application is 32 weeks across London, Greater Manchester and Bristol and the surrounding area, over double the government target of 13 weeks. In addition to this, and despite a worsening housing crisis, the overall volume of major applications determined in London fell by 26%, according to the fourth Annual Planning Survey from the British Property Federation and GL Hearn, part of Capita plc.

Both public and private sector respondents to the survey expressed concern with the lack of resources available to local planning authorities. Over half (55%) of local authorities say under-resourcing is a significant challenge and half (50%) believe the planning system is not operating as well as it was in 2010.

A significant 75% of applicants are dissatisfied with the length of time a planning application takes – up from 71% last year. The survey found that nearly two thirds (65%) of applicants would be happy to pay more if it would shorten determination times.

Key regional findings include:

In London, the average submission to determination time is 34 weeks – 6 weeks longer than last year’s study (28 weeks) but a modest improvement from 2011/12 when it stood at 37 weeks;

The average submission to determination time is 27 weeks in both Greater Manchester, Bristol and the surrounding area;

The volume of major planning applications determined has fallen by 26% in London, increased by 19% in Manchester, and stayed the same in Bristol and the surrounding area;

In line with diminishing land opportunities in the capital, densification is a more prevalent priority for applicants in London (47%) compared to applicants in the North West (14%).

Commenting on the findings of this year’s Annual Planning Survey, Shaun Andrews, GL Hearn’s head of investor and developer planning, said: “In order to get Britain building again, we need to get Britain planning. Development activity is critical for our economy, not least in order to tackle the urgent housing crisis. This year’s Annual Planning Survey shows that the planning system needs investment – and that requires action across the board.  

“We need to ensure that planning authorities have the right people with the right skills and powers in place to drive forward a growth agenda – and that the system is able to release the right resources when it’s needed. For their part, developers need to speak with a single voice – and make it clear what levels of service they need and how much they are prepared to pay for it.

“'There is an urgent need to find bold new solutions to this shared challenge. Further streamlining of the system may well be part of the solution but to get Britain planning to enable growth requires investment. This is an industry-wide issue that needs us all to collaborate to prevent a poorly functioning planning system stifling economic growth.”

Melanie Leech, chief executive at the British Property Federation, commented: “This report shows quite clearly that local authority planning departments are struggling to cope as a result of the efforts to find savings across the public sector, and that this is having a negative impact on local authorities’ ability to  deliver a timely and efficient service .

“The fact of the matter is that an effective planning system is crucial to enabling regeneration and development, and if government wants to meet the housing challenge and develop the commercial buildings that support our economy, it is going to need to take action.

“The report shows that there is potentially scope for the private sector to plug this gap, and we urge the government to begin a dialogue with the property industry to see how this might be taken forward.”

Featured News

Specification news
Mitsubishi Electric unveils the future of home heating

Mitsubishi Electric has announced the expansion of its highly efficient and...

Read More >>

Specification news
CRL Paris System now available in four design-led...

Newly available in a chic and sophisticated Matte Black finish, the CRL Paris System...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>