Skanska scales annual league summit for first time

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:10 AM

Skanska scales annual league summit for first time

A series of high profile contract wins has helped Skanska reach the top of Glenigan’s annual contractor league table for the first time.

The contractor brought Kier and Balfour Beatty’s 20-month reign over the annual leagues to an end after securing five deals worth £411 million in February.

Recent successes include a £330 million contract for the construction management of AstraZeneca’s new corporate headquarters in Cambridge (Glenigan Project ID: 13094658). Skanska’s total annual haul also includes a £600 million contract for phase two of the Battersea Power Station regeneration scheme (Glenigan Project ID: 13109360).

Laing O’Rourke took pole position in the monthly league table after bagging the £440 million Westgate Oxford project for joint clients Land Securities and Crown Estates (Glenigan Project ID: 00296266) and an £80 million office scheme for Mosley Street Ventures in Manchester (Glenigan Project ID: 13159975).

Morgan Sindall climbed to third place, buoyed by a £80 million contract to build 600 homes for Kings Lynn and West Norfolk Borough Council (Glenigan Project ID: 14394210) and a £30 million student services centre for Cambridge University (Glenigan Project ID: 14262446).

AstraZeneca’s Cambridge Biomedical Campus project has seen it shoot straight to the top of the latest monthly client table. The development, which will include a global research and development centre, is expected to complete in 2016/17.

Elsewhere in this month’s contractor leagues, Aecom is a new entry at the top of the quantity surveyor table after winning seven deals worth £544.5 million. Hoare Lee climbed six places to take the number one spot in the consulting engineers tables, while Dixon Jones leads the list of top 20 architects.

Glenigan league tables are produced from comprehensive UK construction activity data and provide a snapshot of contractor performance over a 12-month period. Projects are tracked to completion on site by Glenigan researchers, who make over one million phone calls per year to provide timely, robust data.

Featured News

Specification news
OK, we’re calling it – this is the must-attend BIG...

This is the BIG one! Thirty years in the making, SPATEX 2026, is the BIG, beautiful...

Read More >>

Specification news
Rethinking the Sports Pavilion: A Specification for...

As the sports and leisure sector evolves, the specification of ancillary buildings is...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

ACO Blue Roof Guide – Vol 2 Brochure

ACO Blue Roof Guide...
By ACO Building Drainag...

Download Now >>

Stannah Commercial Brochure Brochure

Stannah Commercial B...
By Stannah Group

Download Now >>

Stannah Midilift CLS Brochure

Stannah Midilift CLS
By Stannah Group

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

PuraDor
PuraDor

Comprehensive range of veneered and painted internal doorsets.SpecificationPuraDor is our most...

Read More >>

Decorative Salvage
Decorative Salvage

Decorative Salvage Embrace the charm of the past with our Decorative Salvage collection. This...

Read More >>

Roofing Materials
Roofing Materials

Roofing Materials Browse our carefully curated collection of reclaimed roof tiles and slates, ideal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Reclaimed Brick Company Leah's Yard Square Sheffield
Reclaimed Brick Company Leah's Yard Square Sheffield

Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...

Watch Now >>

Day in the life of a Reclamation Yard
Day in the life of a Reclamation Yard

A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...

Watch Now >>

Reclaimed Brick Display at Reclamation Yard
Reclaimed Brick Display at Reclamation Yard

Reclaimed Brick Display at Reclamation Yard

Watch Now >>