Latest News Wed, Jul 20, 2016 10:29 AM
Contractor Mitchellson Formwork opted for the DOYMA Curaflex pipe sleeve – 3000 and 3000T –as well as the 3001 DOYMA Curaflex pipe sleeve. Also specified was the DOYMA Curaflex 5000 pipe sleeve systempipe sleeve system.
Benefits of the 3000 and 3000/T solutions include homogeneous connection to concrete enhanced by special grooving, plus the inside face of the sleeve provides an optimum contact surface for the elastomer of the Curaflex gasket insert. It forms a watertight bond with the concrete because the coefficient of expansion of the material corresponds to that of concrete and is ideal for buildings without tanking membranes.
The DOYMA Curaflex 3000 and 3001 pipe sleeves are manufactured from a dimensionally stable and resistant special fibrous cement; /T denotes split version for retrofitting around pre-installed services which can then be sealed using a split gasket. The capability to seal leaking service entries without having the inconvenience of disrupting continuity of service resulting from service disconnection is a real advantage.
The DOYMA Curaflex 5000 pipe sleeve is a steel version for high static loads with integrated fixed and loose membrane clamping flanges and can also be installed flush within the shuttering. DOYMA Curaflex sleeves are fire resistant and, in conjunction with an intumescent packing appropriate to the ducted service, not only seal against water ingress (watertight up to 3 bars pressure) but also stop the spread of fire.
Designed by Duggan Morris Architects, R7 is a versatile building that can accommodate small and growing companies as well as larger occupiers requiring an entire floor or more. Over ten floors,R7 integrates shared spaces to encourage collaboration and community, including a 6,000 sq ft communal roof terrace.
R7 is perfectly positioned at London’s main transport hub, with all the amenities of vibrant King’s Cross on your doorstep. The upper office levels have highly flexible floorplates. These can be sub-divided into a variety of smaller or larger areas with the ability to link floors vertically via internal stairs.
Each floor will have at least one terrace, with a large, shared roof terrace on the ninth floor. A basement ‘cycle spa’ provides 260 bike spaces, changing rooms and showers.
Featured News
UKGBC has officially launched a consultation into a new UK Climate Resilience Roadmap...
A new report published by the Construction Leadership Council sets out the four main...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
FRAMESAFE 5000 FR
By Glidevale Protect Co...
Novantica - Cement F...
By Fassa Bortolo
Fassatherm System -...
By Fassa Bortolo
Fassarend System - P...
By Fassa Bortolo
Fassalime System - P...
By Fassa Bortolo
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London