Election causes delays in public sector starts

Latest News Thu, Aug 17, 2017 8:14 AM

The value of work starting on site in the three months to June was 4% lower than during the second quarter of 2016, according to the latest Glenigan Index.

However on a seasonally adjusted basis, starts were 10% higher than during first three months of 2017.

The value of work starting on site in the three months to July was 10% lower than during the same period a year ago, according to the latest Glenigan Index. However on a seasonally adjusted basis, starts were 6% higher than during February 2017 to April 2017.

Commenting on this month’s figures, Allan Wilén, Glenigan’s Economics Director, said: “The year on year decline in project starts is in part due to decisions on public sector projects being temporarily delayed by the snap general election, with education, health, infrastructure and community & amenity sectors witnessing the sharpest declines.

"We anticipate that these delayed projects will bolster starts over the coming months as work gets underway post-election. Private sector starts have performed better, although there has been a weakening in a number of areas.

“Overall non-residential projects were 15% down on a year ago, but on a seasonally adjusted basis were 7% up the preceding three months. The health sector has seen the sharpest decline, with starts down 59% both on a year ago and against the preceding three months. There were also double digit year on year declines in the education, community & amenity and retail sectors. These declines were accompanied by a 6% drop in office project starts. Industrial starts were also 9% lower, having been a growth sector since the opening months of 2017. In contrast there has been strong growth in hotel & leisure work.

“Private residential starts plateaued during the three months to July, being little changed on the preceding three months or the level of a year ago. The stabilisation in project starts follows quieter conditions in the wider housing market. In contrast, there has been an encouraging upturn in social housing starts, which on a seasonally adjusted basis were 23% up on a February to April 2017.

"Civil engineering starts were 23% lower than a year ago, driven by a drop in infrastructure projects as the snap election push backed the commissioning of public sector transport projects.”

There were sharp variations in project starts across the country. Whilst most parts of the UK have seen a declines, the value of project starts rose in the north of England, with year on year increases of 10%, 19% and 8% in the North East, North West and Yorkshire & the Humber respectively. The sharpest growth, however, was in the East of England, where starts were 60% up on a year ago.

Featured News

Specification news
Opening of £11.1m SEND teaching block and hydrotherapy...

Morgan Sindall Construction has celebrated the opening of a new SEND teaching block...

Read More >>

Specification news
More money and more land needed for London CLTs and...

London’s community land trusts and housing cooperatives need more financial support...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

Hardie backer fibre cement backerboard for Tile & Stone  Brochure

Hardie backer fibre...
By James Hardie

Download Now >>

RIVERSTONE® - DISCOVER NATURAL PHYLLITE Brochure

RIVERSTONE® - DISCOV...
By SSQ

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Senses White Fleck Kitchen Surfaces
Senses White Fleck Kitchen Surfaces

Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...

Read More >>

SM 485: fast-setting, self-levelling smooth coat for interior floors
SM 485: fast-setting, self-levelling smooth coat for interior floors

FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...

Read More >>

SL 416: A fast-setting, self-levelling smooth coat for interior floors
SL 416: A fast-setting, self-levelling smooth coat for interior floors

FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>