Bespoke Impey wetroom solution for Nine Elms Point Development

Latest News Tue, Jan 16, 2018 3:18 PM

Barratt London’s flagship Nine Elms Point development in SW8 will offer 645 stunning homes incorporated in seven attractive buildings, including two iconic towers.

Residents of Barratt London’s Nine Elms Point will be able to take advantage of the extensive range high-specification options within their home, including spectacular modern wetrooms.

Barratt London worked in conjunction with Impey’s R&D team on a bespoke wetroom solution, which would give the top-of-the-range shower rooms at Nine Elms Point a stylish and contemporary finish, with supreme functionality, ideally suited to the look and feel of the development.

The elongated width of the linear wetroom channel, meant that a standard ‘off the shelf’ product would be far too short, so Barratt London commissioned Impey’s experienced R&D team to create a bespoke product, which would enhance the look of the wetrooms, as well as effectively draining away excess water from the powerful rainforest showerheads.

The team came up with an attractive design, incorporating a functional and robust floor channel drainage moulding which could be installed first and screeded in place. The polished stainless steel linear wetroom drain top, produced in three parts for ease of installation, could then be fitted on completion, to prevent any accidental damage happening on site.

The company had the option to choose from several finishes, including glass and tiled inserts, and decided upon highly polished stainless steel tops to coordinate with the contemporary wetroom design schemes at the development.
In addition, all the development’s wetrooms were waterproofed with Impey’s elite tanking product, WaterGuard

Contact us for more information about specifying bespoke wet room solutions.

Featured News

Specification news
New home registrations rise with developers encouraged...

Figures released by the National House Building Council (NHBC), the UK’s largest...

Read More >>

Specification news
Kier appointed to deliver college campus redevelopment...

Kier has been appointed by the Department for Education to deliver a campus...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

AKW Bathroom Catalogue 2025 Brochure

AKW Bathroom Catalog...
By AKW

Download Now >>

Baths Collection Brochure Brochure

Baths Collection Bro...
By AKW

Download Now >>

Your high performance facade panel. With James Hardie, It’s Possible™ Brochure

Your high performanc...
By James Hardie

Download Now >>

James Hardie brings unique designs to life with beautiful fibre cement products that are built to last. It’s Possible™ Brochure

James Hardie brings...
By James Hardie

Download Now >>

fermacell® The Specification Guide Brochure

fermacell® The Speci...
By James Hardie

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

SOPRALENE FLAM 180 AF
SOPRALENE FLAM 180 AF

Membrane composed of elastomer modified bitumen and a non woven polyester reinforcement.The upper...

Read More >>

FLAGON SR DE PVC
FLAGON SR DE PVC

Membrane composed of flexible PVC and a polyester reinforcement. Available in different RAL...

Read More >>

FLAGON S PVC
FLAGON S PVC

Membrane composed of flexible PVC. Available in different RAL Colours.Used for detailing work. The...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>

Dining Area Canopy at John Spendluffe Technology College
Dining Area Canopy at John Spendluffe Technology College

We designed and installed a new dining area canopy for John Spendluffe Technology College. This has...

Watch Now >>