Latest News Mon, Mar 19, 2018 9:40 AM
Cheltenham Racecourse continually invests in developing and improving their facilities and most recently refurbished the hall of fame and entrance hall in October 2013. Thousands of people walk through the entrance and hall of fame every year so the client required a robust and stylish finish. Quality installation was therefore paramount so the contractor, Floorline turned to UZIN to ensure the installation was durable and completed to the highest of standards.
A WOLFF Turbo Stripper and Duro Stripper as well as UZIN KE 2560UK carpet adhesive helped contribute towards the overhaul of the floors at the racecourse. The WOLFF machines were first used to remove the old carpet, before UZIN KE 2560UK was used to install 1700 square metres of bespoke Wilton Carpet. The new Wilton Carpet was exceptionally well finished and the refurbishment created a vibrant and welcoming atmosphere.
Featured News
Construction of a new government office in Manchester city centre is entering its...
The Government has delivered on manifesto commitment to reduce red tape – merging...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Your high performanc...
By James Hardie
James Hardie brings...
By James Hardie
fermacell® The Speci...
By James Hardie
Hardie backer fibre...
By James Hardie
RIVERSTONE® - DISCOV...
By SSQ
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Senses Kitchen Surfaces. Beautifully Crafted, Effortlessly Maintained. The Senses range of...
FASSA's new SM 485: Your choice for a fast-setting, self-levelling smooth coat for interior floors,...
FASSA's new SL 416: A fast-setting, self-levelling smooth coat for interior floors. With superb...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Specification Insights with Majestic London Showers
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London