Increased building materials volumes keep housebuilders in supply  

Housing Mon, Jun 18, 2018 9:15 AM

With the UK in the grip of a housing crisis, the government has naturally focused its efforts on increasing the number of new homes built, by setting an ambitious target of 300,000 a year.

That means now, more than ever, it’s important for building materials manufacturers to play their role by ensuring housebuilders have the large volumes of product available to help meet demand.

However, recent research by the Federations of Master Builders (FMB) has revealed that building materials manufacturers are struggling to cope with the rise in demand, which is having a knock on effect on developers and their build programme.

Bricks were in shortest supply with the longest reported wait time being more than one year, followed by roof tiles, where the wait in some cases was up to six months. Other entries include aircrete blocks in sixth place, with the longest wait time experienced approximately four months.

Aggregate Industries’ Building Products division has managed to avoid this shortage of products and guarantee product availability to clients, after anticipating the surge in demand from housebuilders. Specialising in concrete blocks, walling solutions, roofing tiles and packed cement products for both commercial and residential buildings, Jeremy Lee, sales director for Aggregate Industries, explains:

“It’s no secret that there’s a shortage of housing in the UK, especially as year-after-year it remains a key focus of every Budget announcement by the government. The government has been putting pressure on developers to increase their build numbers, and we knew that those housebuilders would respond. That’s why we made sure we were ready to react to the surge in demand by investing early on into our operations and spending £2.5 million, 12 months ago, to increase the capacity at three of our factories.”

The £2.5 million improvements were made at its Croft Block Plant in Leicestershire, and its Torr and Callow Block Plants, both in Somerset. This funded the addition of an ‘egg-laying’ operation at Croft to create greater capacity, as well as extending the manufacturing area in Torr and purchasing new machinery for Torr and Callow to aid a more efficient manufacturing process.

Jeremy Lee, continues: “By making the investment early on, we are now in the enviable position of having the large volumes of products available to meet the increased demand. Clients are coming to us to complete jobs, as they know we have the capacity to fulfil the order, whilst other suppliers may struggle to meet the requirements. We’re glad to be playing our part in keeping developers in supply and making our vital contribution to the recovery of the housing shortage.”

Featured News

Specification news
Skyline Architectural Aluminium from Alumasc sets off...

The owner of a major property development company has chosen Skyline Architectural...

Read More >>

Specification news
The need for a better understanding of worktop...

Recent health concerns around surrounding certain artificial stone kitchen worktops...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Gerflor Taraflex® Sports Flooring | 2024 | EN Brochure

Gerflor Taraflex® Sp...
By Gerflor

Download Now >>

Gerflor Social Housing Floors | 2024 | EN Brochure

Gerflor Social Housi...
By Gerflor

Download Now >>

Gerflor Retail Flooring | 2024 | EN Brochure

Gerflor Retail Floor...
By Gerflor

Download Now >>

Gerflor Industry Flooring | 2024 | EN Brochure

Gerflor Industry Flo...
By Gerflor

Download Now >>

Gerflor Hospitality Flooring | 2024 | EN Brochure

Gerflor Hospitality...
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>