Fall protection specification-switching: a risk too far?

Latest News Fri, Jun 14, 2019 8:16 AM

Cleaning gutters and windows, accessing or installing solar panels, servicing ventilation and air conditioning, inspecting roofing – these are all essential maintenance tasks that require safe access. Yet over the last five years, Health and Safety Executive statistics show that falls from a height have accounted for 26% of all fatal accident injuries (an average of 37 fatal injuries per year). Half of all these deaths - averaging 19 per year - have been within the construction sector.

Creating a totally risk-free new building is clearly unrealistic. But whenever a new building is being conceived, all stakeholders have a unique opportunity to design out risk as far as possible. CDM 2015 Regulations and principal designer/contractor roles should mitigate exposure by forcing assessment of risk. Yet despite these protocols, all too often principal contractors are still presented with scant specification guidance surrounding appropriate fall protection systems.

A catch-all ‘fall protection by specialist’ annotation on a drawing suggests that HSE compliance, rather than safety-led building design at the outset, is the motivation. Why is this?

How price overshadows performance

It’s often the start of a hidden thorny issue. A design project may proceed on through tenders and approvals without any more thought to safe access until a contractor is bidding. At this point, one or more specialists are asked to price “a system” – without a clear understanding of what it’s actually required to do. And as there is still no approved scheme or detailed risk-based specification in place, contractors have no way to decide if one supplier’s system is suitable, or better than another’s.

Switching from supplier to another based on price may aid a contractor’s bid but ignores the fact that systems fundamentally differ in quality and performance. Superior products will comply with more rigorous testing standards and may also offer specific compatibility with the type of structure and application required for access.

Clear documentation can help de-risk

Future-proofing is also an important consideration. Managing total cost of ownership and change efficiently through the whole lifecycle is increasingly important. With the advent of Building Information Modelling (BIM) systems, owners and operators have the ability to document and explore a structure through its entire lifecycle. My own company, for example, is currently one of the only safety system providers to offer full BIM support, allowing detailed specifications to be embedded and ensuring continued compliance as structures change over time.

As a principal contractor, you have a duty of care to your client. You should ensure that the fall protection system you put forward doesn’t simply tick a compliance box; rather it provides the appropriate strategy based on the risk assessment for the structure. It’s never too early to consider how safety measures will reduce the risk of injury or death for those tasked with working at height.

Featured News

Specification news
Raising the Bar for Hand Hygiene Practices

Effective hand hygiene is essential for disease prevention. Architects must therefore...

Read More >>

Specification news
GEZE UK announce Kids' Village charity partnership

Kids' Village is delighted to have partnered with GEZE UK as their 2025 charity of...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mermet | Kibo Darkening | 2024–2027 | EN Brochure

Mermet | Kibo Darken...
By Mermet UK

Download Now >>

Mermet | Karellis Darkening | 2024–2027 | EN Brochure

Mermet | Karellis Da...
By Mermet UK

Download Now >>

Mermet | Flocké Darkening | 2024–2027 | EN Brochure

Mermet | Flocké Dark...
By Mermet UK

Download Now >>

Mermet | Shadow 24 Basics | 2024–2027 | EN Brochure

Mermet | Shadow 24 B...
By Mermet UK

Download Now >>

Mermet | Natté PES Basics | 2024–2027 | EN Brochure

Mermet | Natté PES B...
By Mermet UK

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Specification Insights with Majestic London Showers
Specification Insights with Majestic London Showers

Specification Insights with Majestic London Showers

Watch Now >>

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>