Latest News Fri, Aug 9, 2019 8:56 AM
Apollo Fire Detectors’ innovative SOTERIA® range of detectors has been chosen to protect the prestigious Darrick Wood School in Orpington, Kent.
The school is rated by Ofsted as ‘outstanding’ and achieved the ‘World Class Schools Quality Mark in’ 2015.
The fire detection system was upgraded as part of a wider programme of works which saw the school invest in a new dining hall, a Movement & Performing Arts Building with specialist Drama and Music rooms and new PE changing rooms. Many of these new buildings encompass large open areas with high ceilings and interconnected spaces, which presented a challenge for the project’s fire detection system designer, Triple Star Fire & Security Ltd.
The project
Built in 1975, Darrick Wood School has been extended over the years and the existing fire detection system was in need of an upgrade. The installation of a brand new system to protect the pupils, staff and visitors using the most recently added school buildings provided an opportunity to upgrade some parts of the existing system. The existing and new fire systems will be fully integrated to ensure compatibility across the school.
To avoid any disruption to pupils and staff during term time, all installation and upgrade work on the systems took place during the school holidays.
The Installation
The main building contractor, Ammcass Group, appointed local experts Triple Star Fire & Security Ltd to design and install the state-of-the-art fire detection system, which is based on Apollo’s award-winning SOTERIA® range of detectors.
Explaining the choices made at Darrick Wood School, Daren Pool, Managing Director of Triple Star, said: “SOTERIA was the ideal product for this large school. With this advanced technology available, we were able to offer superior reliability of detection and reduction of false alarms – exactly the features required in this environment.”
Up to 100 Apollo SOTERIA devices, including manual call points and interfaces, were fitted at Darrick Wood, along with bells and strobes designed for the school environment. The system is managed by two Advanced MX5 control panels – one located in the main reception area and the other in the sports centre reception. The system is programmed to operate a ‘one out, all out’ procedure in the event of a fire being detected.
The Final Verdict
Graham Field, Premises Manager at Darrick Wood School, commented: “The installation of the new fire protection system went smoothly during the holidays, so that we could proudly open the new buildings and provide the pupils with enhanced facilities. It was reassuring to have the latest SOTERIA technology installed. We’re very happy with the modern aesthetics of the devices and are confident that the school’s fire protection is future-proofed for the years ahead.”
For further information visit www.apollo-fire.co.uk.
Featured News
As the heart of North Kensington evolves, the Westway Community Street project...
A ‘remarkable’ retrofit of Brighton’s timber-framed landmark arts centre by...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Gerflor Hospitality...
By Gerflor
Gerflor Education Br...
By Gerflor
Gerflor Flooring Col...
By Gerflor
Gerflor CSR Report |...
By Gerflor
OAK NATURE
By Junckers Limited
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...
The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...
Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...
CONSTRUCTION VIDEOS - LATEST VIDEOS
“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...
Portakabin | Installation at the iconic Admiralty Arch, London