FPA calls for total ban on combustible materials

Latest News Mon, Nov 18, 2019 4:29 PM

The recent ban on combustible building materials by the government was for buildings over 18 metres – or six storeys high.

The Cube student block in Bolton (providing student accommodation in a six storey block) which caught fire on Friday provides a stark reminder that the problem facing UK fire safety is the result of many issues and not just Grenfell style ACM cladding.

Although the final details have not yet been released, there are a number of key issues reported, all of which are relevant to the ongoing discussions around the current Building Regulations review:

  1. This was a modern building, designed and built using all of the latest rules, guides and expertise available. Yet, with two people injured, this must be classed as a near miss event. The high pressure laminate (HPL) and timber cladding components clearly played a large part in the fire’s progress, possibly in association with the insulation and cavity membranes present. Since Grenfell, HPL has been talked about to some degree, but no doubt thorough investigations and consideration have been hampered by it not being the focus of a major incident - until now.
  2. This was a risk in a building only six storeys high, where students sleep. Clearly, we should not limit regulations to the mere height of a building.
  3. Fire alarms are reported as being almost a daily event, so it is understandable that students did not assume Friday’s to be any different. Despite this, we know high integrity alarm systems exist which are tested for immunity for common ‘false challenges’. Despite countless calls for change over many years, they remain not legislated for.

Jonathan O’Neill, managing director of the Fire Protection Association, commented: “The fires at the Bolton student block, Worcester Park in London and the Beechmere care village in Cheshire, prove we cannot be housing people in buildings made from combustible materials. This issue needs to be addressed urgently; it simply cannot wait. We urge this issue to be a priority for the new government.”

Fire legislation in the UK has always been slow to develop. It is reactive, and often requires a major incident or a prolonged statistical demonstration of emerging issues, during which time much harm may be done. It is interesting to note now after years of lax regulation and the increasing use of combustible materials in the structure, insulation, and cladding of buildings, how quickly evidence of fault is currently being uncovered. It demands a similarly speedy response, faster perhaps than has happened since Grenfell.

Manchester’s fire community has been one of the most proactive in assessing and managing their multi storey buildings since Grenfell, and are to be credited for their response and actions which led to an amendment requiring a full evacuation policy.

More than two years on from Grenfell, we are still putting vulnerable people at risk, the FPA continued. Should this incident alone not demand the selection of non-combustible materials, deployment of a believable detection and alarm system and the installation of sprinklers to ensure the safety of those away from home in education? This scenario is no different to a school, care home or hospital. Risk is a combination of many factors, of which height is only one.

The Fire Protection Association, the UK’s national fire safety organisation, is calling for:

  • supporting the combustibility ban for buildings based upon risk rather than height alone
  • the mandation of high integrity alarm systems as a means to solving the false and unwanted alarms issue
  • a requirement for two means of escape from high rise buildings
  • for stay put policies to be used only after thorough intrusive inspection to the building to ensure it is capable of supporting it
  • the mandation of sprinklers in high risk environments such as schools and care homes.

Photo: GMFRS

Featured News

Specification news
Risk Assessment Requirements for UK Businesses

Understanding risk assessment requirements is essential for organisations that want...

Read More >>

Specification news
New forecast highlights the construction skills needed...

The Construction Industry Training Board (CITB) has published its Construction...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

Paints & Coatings Brochure

Paints & Coatings
By F.H. Brundle

Download Now >>

Cedral Roofs Brochure Brochure

Cedral Roofs Brochur...
By Cedral by Etex

Download Now >>

Cedral Facades Brochure Brochure

Cedral Facades Broch...
By Cedral by Etex

Download Now >>

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

Cedral Thrutone Smooth
Cedral Thrutone Smooth

Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...

Read More >>

Cedral Rivendale
Cedral Rivendale

Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>