Oaks Industrial Estate

Library Fri, Mar 19, 2021 11:36 AM

Leicestershire based fabricators Season Master Windows were instrumental in the redevelopment of the industrial estate they work in. After the decision was made to update all the units, it seemed only natural to approach a company based on the industrial estate to supply the new windows for the 15 units.

The Challenge

The new windows were required to be thermally efficient to ensure all the upgrades made the industrial units economical for the occupants as well as creating a modern and clean look to the estate. Working to a schedule Season Master Windows needed to have fabricated and installed the replacement windows within 8 weeks.

The Solution

Season Master Windows approached their trusted aluminium supplier, Kestrel Aluminium Systems, to supply the complete kit required to fabricate the windows. Opting for the 60mm Window System to give maximum thermal performance the windows were specified as ‘top hung open out’ to allow natural ventilation. Trickle vents were also installed to ensure constant ventilation.

The Benefit

In opting for the use of aluminium windows the industrial estate has been given a modern makeover and the owners and occupiers have peace of mind that the units are safe and secure.

Season Master Windows knew they would be able to meet the time scale set as the delivery of material would be with them in full within 2 working weeks. Commenting on his customers’ project Area Sales Representative, Duncan Holland, said “We were delighted that Season Master Windows chose to suggest the installation of Kestrel products on their own industrial estate. What better way to promote the products they sell than by installing them on site.”

For more information on the services offered by Season Master Windows please contact: info@seasonmasterwindows.co.uk

Featured News

Specification news
Sustainability Focus Group

The A. Proctor Group, has set up a dedicated Sustainability Focus Group. This...

Read More >>

Specification news
Roofshield - Boleskine House Estate

The world-renowned Roofshield membrane from the A. Proctor Group has been installed...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>