Faster progress needed on decarbonising infrastructure to meet targets

Latest News Tue, Apr 20, 2021 9:27 AM

The Infrastructure Carbon Review (ICR) was published in November 2013 with the call to action to ‘reduce carbon, reduce cost’.

Seven years on, and with the UK Government committed to achieving net-zero emissions by 2050, the Green Construction Board - the net zero and sustainability technical lead for the Construction Leadership Council - has assessed industry’s progress to date on decarbonising infrastructure.

Using case studies it identified areas of progress and increasing maturity of decarbonisation in infrastructure projects. However, the current rate of progress is unlikely to get us to the net zero carbon transition in time for 2050. The ICR highlighted that infrastructure is responsible for more than half of the national carbon footprint.

UK infrastructure can play a pivotal role in accelerating decarbonisation towards the net-zero aspirations. Since the inception of the ICR more than 70 organisations have made carbon reduction commitments. Innovations have been brought to market and are being scaled. An international standard for managing infrastructure carbon, PAS 2080:2016, has been created, providing a common whole life carbon management framework necessary for any organisation in the industry to realise the benefits.

This stocktake report highlights the significant blockers to faster implementation of decarbonisation; and sets out key recommendations for a net zero carbon era. Traditional procurement and commercial solutions continue to incentivise lowest capital cost holding back progress in meaningful decarbonisation in project delivery:

  • Cross-sector collaboration is essential to maximise carbon reduction opportunities and avoid silo working.
  • Effort has focussed on capital carbon reduction, without an appreciation of the capital carbon investment needed to unlock the much bigger operational and user carbon savings required to decarbonise infrastructure systems.
  • Systemic thinking is yet to be reflected in the maturity of our decarbonisation efforts. The case for integrated infrastructure needs to be made.
  • PAS 2080 has been highly effective by providing a consistent framework to carbon management, including the requirement for strong leadership. However, few organisations have truly embedded the principles of PAS 2080 into their investment decision-making and more leadership on collaboration to reduce carbon is needed and PAS 2080 uptake is still slow.
  • We still need an exemplar programme that drives decarbonisation behaviours for whole-life step-change.
  • More consideration on retrofitting existing infrastructure to be fit for net-zero carbon.
  • Regulators need to align sector-level price control with the net-zero carbon requirement.

Through our industry change programme, CO2nstruct Zero, we will work with the industry to support and drive the change needed in our Construction Activity priorities and set transparent goals and clear actions to achieve our net zero goals and decarbonise infrastructure through these recommendations.

Construction Leadership Council chairman Andy Mitchell: “This report highlights the work this sector has and is doing to decarbonise infrastructure. However, it also highlights that there is much more to be done if the sector is to transition and align to net zero ambitions.

“The CLC will work with the industry to address and unlock the steps it needs to make to improve progress; and ensure that our industry is doing what is needed to meet our 2050 net zero target.”

Featured News

Specification news
UK construction market set for gradual but uneven...

Research from international real estate advisor Savills points to a gradual recovery...

Read More >>

Specification news
Meet the homes competing for RIBA House of the Year...

The ninth series of Grand Designs: House of the Year will air on Channel 4, sharing...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>