Faster progress needed on decarbonising infrastructure to meet targets

Latest News Tue, Apr 20, 2021 9:27 AM

The Infrastructure Carbon Review (ICR) was published in November 2013 with the call to action to ‘reduce carbon, reduce cost’.

Seven years on, and with the UK Government committed to achieving net-zero emissions by 2050, the Green Construction Board - the net zero and sustainability technical lead for the Construction Leadership Council - has assessed industry’s progress to date on decarbonising infrastructure.

Using case studies it identified areas of progress and increasing maturity of decarbonisation in infrastructure projects. However, the current rate of progress is unlikely to get us to the net zero carbon transition in time for 2050. The ICR highlighted that infrastructure is responsible for more than half of the national carbon footprint.

UK infrastructure can play a pivotal role in accelerating decarbonisation towards the net-zero aspirations. Since the inception of the ICR more than 70 organisations have made carbon reduction commitments. Innovations have been brought to market and are being scaled. An international standard for managing infrastructure carbon, PAS 2080:2016, has been created, providing a common whole life carbon management framework necessary for any organisation in the industry to realise the benefits.

This stocktake report highlights the significant blockers to faster implementation of decarbonisation; and sets out key recommendations for a net zero carbon era. Traditional procurement and commercial solutions continue to incentivise lowest capital cost holding back progress in meaningful decarbonisation in project delivery:

  • Cross-sector collaboration is essential to maximise carbon reduction opportunities and avoid silo working.
  • Effort has focussed on capital carbon reduction, without an appreciation of the capital carbon investment needed to unlock the much bigger operational and user carbon savings required to decarbonise infrastructure systems.
  • Systemic thinking is yet to be reflected in the maturity of our decarbonisation efforts. The case for integrated infrastructure needs to be made.
  • PAS 2080 has been highly effective by providing a consistent framework to carbon management, including the requirement for strong leadership. However, few organisations have truly embedded the principles of PAS 2080 into their investment decision-making and more leadership on collaboration to reduce carbon is needed and PAS 2080 uptake is still slow.
  • We still need an exemplar programme that drives decarbonisation behaviours for whole-life step-change.
  • More consideration on retrofitting existing infrastructure to be fit for net-zero carbon.
  • Regulators need to align sector-level price control with the net-zero carbon requirement.

Through our industry change programme, CO2nstruct Zero, we will work with the industry to support and drive the change needed in our Construction Activity priorities and set transparent goals and clear actions to achieve our net zero goals and decarbonise infrastructure through these recommendations.

Construction Leadership Council chairman Andy Mitchell: “This report highlights the work this sector has and is doing to decarbonise infrastructure. However, it also highlights that there is much more to be done if the sector is to transition and align to net zero ambitions.

“The CLC will work with the industry to address and unlock the steps it needs to make to improve progress; and ensure that our industry is doing what is needed to meet our 2050 net zero target.”

Featured News

Specification news
The 2024 Architecture MasterPrize (AMP) Awards winners...

The Architecture MasterPrize (AMP) is proud to announce the winners of its 2024...

Read More >>

Specification news
ASSA ABLOY launches new guide and CPD about the...

With the ‘Golden Thread’ becoming increasingly vital to construction, ASSA ABLOY...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>