FPA welcomes transparency in fire safety reporting

Latest News Wed, Apr 28, 2021 5:58 AM

The government has published its second quarterly update on progress to meet the Grenfell Tower Inquiry recommendations, highlighting the breadth of work taking place.

In a useful development, the government is now providing thematic updates of the work taking place by government, the London Fire Brigade, the National Fire Chiefs Council and other bodies to respond to the 46 recommendations made by Sir Martin Moore-Bick in his Phase 1 report.

Key changes in this quarter include:

  • Progress of the Fire Safety Bill through Parliament to include the front doors of flats and external wall systems within the scope of the Fire Safety Order
  • Publication of the Fire Safety consultation response, which set out other changes to the Fire Safety Order, highlighted the continued high levels of automatic fire alarms and the relationship between fire and rescue services and building control
  • The launch of the Fire Broadcast Talkgroup which means that if a fire and rescue service becomes overwhelmed with emergency calls, the affected service can now make an announcement on their control room Airwave Radio and it will be received in every control room across the county simultaneously.

The quarterly update provides progress against every recommendation, indicating where government has worked with other organisations to make progress.

There are notable updates on work related to evacuation.

The Inquiry recommended that the Government develop national guidelines for carrying out partial or total evacuations of high-rise residential buildings. A government led steering group commissioned an evidence review of methods of evacuation is being finalised before publication.

Successful suppliers have been appointed for the building design, human behaviour and evacuation operational research strands.

The update confirms that the government will seek further views on the complex issue of personal emergency evacuation plans. The details of this are currently being decided and the update states that the government aims to launch a consultation focused on Personal Emergency Evacuation Plans in spring 2021.

Jim Glockling, Technical Director of the FPA welcomed the report. He said: “It is really encouraging to see the government reporting in such a transparent way. It’s so important that everyone in the fire sector as well as the general public can have access to work that is going on in government and other agencies.

“We know that the Grenfell Tower fire brought into stark relief the weaknesses in fire safety in the built environment and the FPA continues to work with government and other stakeholders to bring about the improvements that are so desperately needed.”

Featured News

Specification news
Richard Crossley joins Delta’s Technical Team

Strengthening Delta’s Technical Expertise and Specification Services Delta...

Read More >>

Specification news
Full Roofing Package — Gloucester Rugby Club

This project involved the supply of a full roofing package for Gloucester Rugby Club,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>