Eighty-nine per cent of builders having to delay jobs

Latest News Wed, Oct 27, 2021 6:50 AM

The majority of builders have had to delay or cancel jobs because of a lack of skills or materials.

A shocking 89% of local builders have reported having to delay jobs due to a lack of materials or skilled tradespeople, according to the latest State of Trade Survey from the Federation of Master Builders (FMB).

Adding to the pressure facing the industry, 97% of builders have reported skyrocketing material prices and expect this to continue into the last quarter of 2021, with 78% passing this increased cost on to the consumer.

Builders have been forced to hit pause on some jobs, in the face of increasing difficulty to hire tradespeople, such as general labourers and plasterers, with 42% and 37% respectively of builders struggling to get them to a job. Despite a slight easing, near half of FMB members are also facing pressure to find carpenters/joiners and bricklayers.

The FMB State of Trade Survey, which is released quarterly, is the only survey of its kind to track the experience of small to medium-sized (SME) construction firms in the UK. It found:

Delays and cancellations

  • 82% of builders have delayed jobs due to a lack of materials
  • 60% have pressed pause due to a lack of skilled tradespeople
  • Combined, 89% of builders have faced delays due to either materials or skills shortages
  • 8% of builders have been forced to cancel jobs due to a lack of materials
  • 12% have been cancelled due to a lack of skilled tradespeople

Skills shortages

  • 42% can’t get hold of general labourers, up 6% on last quarter
  • 37% can’t hire plasterers, a rise of 6% on last quarter
  • 47% of builders are struggling to hire carpenters/joiners, down 6% on last quarter
  • 45% are struggling to hire bricklayers, a fall of 2% on last quarter

Price rises

  • 97% of builders are facing material price rises, with 93% expecting this to continue into Q4
  • 77% of respondents have been forced to raise their prices in the past quarter

Brian Berry, Chief Executive of the FMB, described the survey as a damning situation for the building industry. “The Government should use the Budget and Spending Review to tackle the growing skills gap,” he said.

“Effective efforts to help the haulage industry ease the supply of materials are also needed. This will help our members get back to building and help the post pandemic economic recovery.

“Our data shows the combination of long delays and rising prices mean consumers are also starting to feal the heat. Changing quotes, delays to jobs, and price hikes may lead to some homeowners being pulled in by unscrupulous builders hoping to make a quick buck.

“A good builder is a busy builder and it is important for consumers to be patient when selecting a builder.”

Featured News

Specification news
Gatic announces relocation of Access Covers

Drainage product manufacturer Gatic has announced that its range of access covers...

Read More >>

Specification news
Architects increasingly optimistic about workloads and...

The Royal Institute of British Architects (RIBA) has published the findings of its...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>