Green Homes Grant scheme ‘a slam dunk fail’, say MPs

Latest News Thu, Dec 2, 2021 9:54 AM

In a new report the Public Accounts Committee says the Green Homes Grant Voucher Scheme “underperformed badly”, upgrading only about 47,500 homes out of the 600,000 originally envisaged and delivering a small fraction of the expected jobs.

The project accounted for just £314 million of its original £1.5 billion budget, and £50 million of that was administration costs - more than £1,000 per home upgraded.

The PAC is also “not convinced that BEIS has fully acknowledged the scale of its failures with this scheme”. The scheme’s failure “continues government’s troubled record of energy efficiency initiatives and risks damaging the Department’s future efforts to harness both consumer and industry action to deliver Government’s net zero commitments”.

The Scheme was implemented as an urgent response to the COVID-19 crisis, aiming to support jobs at a time of significant risk for the economy while also reducing carbon emissions from homes – but the 12-week timescale to implement it was unrealistic and BEIS proceeded with it despite its own Projects and Investment Committee rejecting its business case.

The result was “a scheme with poor design and troubled implementation”. By August 2021, 52% of homeowners’ voucher applications were rejected or withdrawn, and 46% of installer applications failed. The Scheme’s primary aim was to support jobs but its design and duration limited its impact on employment, and its abrupt closure may have in fact led to redundancies.

Dame Meg Hillier MP, Chair of the Public Accounts Committee said: “It cost the taxpayer £50 million just to administer the pointlessly rushed through Green Homes Grant scheme, which delivered a small fraction of its objectives, either in environmental benefits or the promised new jobs.

“We heard it can take 48 months - 4 years - to train the specialists required to implement key parts of a scheme that was dreamed up to be rolled out in 12 weeks. It was never going to work at this time, in this way, and that should have been blindingly obvious to the Department. That it was not is a serious worry.

“I am afraid there is no escaping the conclusion that this scheme was a slam dunk fail.

“We will need this massive, step change in the way our homes and public buildings are heated, but the way this was devised and run was just a terrible waste of money and opportunity at a time when we can least afford it.”

The failure of the Green Homes Grant Scheme was a disappointment and the Government must learn from these findings to ensure similar, future schemes work better for industry and consumers, says the Federation of Master Builders (FMB).

Brian Berry, Chief Executive of the FMB said: It is not surprising to read the Public Accounts Committee’s damning assessment of last year’s Green Homes Grant Scheme. By the experience of our own members, the FMB echoes the Committee’s criticisms and know that the scheme was too short-term in outlook. Critically, it did not allow sufficient time for builders to upskill and gain the necessary accreditations. For those that did make the leap, they ended up spending large sums of money only to have the scheme pulled from under their feet.

“This stop-go green initiative undermined certainty for both the public and builders in trying to stimulate demand for energy efficient home improvements. The Government needs a National Retrofit Strategy which sets out a clear, long-term plan to upgrade our existing homes and would go some way to restore faith in green initiatives with the public and industry.”

Featured News

Specification news
West Fraser products – the natural choice for MMC

Offsite construction has moved from niche curiosity in the 1990’s to mainstream...

Read More >>

Specification news
NAO assesses progress of Parliament Restoration and...

A new National Audit Office (NAO) report examines the progress and evidence...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

Paints & Coatings Brochure

Paints & Coatings
By F.H. Brundle

Download Now >>

Cedral Roofs Brochure Brochure

Cedral Roofs Brochur...
By Cedral by Etex

Download Now >>

Cedral Facades Brochure Brochure

Cedral Facades Broch...
By Cedral by Etex

Download Now >>

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

Cedral Thrutone Smooth
Cedral Thrutone Smooth

Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...

Read More >>

Cedral Rivendale
Cedral Rivendale

Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>