Kier hands over 22-storey residential building

Latest News Tue, Dec 7, 2021 7:53 AM

Kier has handed over Millstream Tower in Tottenham Hale to Newlon Housing Trust.

This residential development is one of the first buildings to be delivered as part of the Tottenham Hale masterplan which aims to create a bustling centre with a well-connected transport hub, affordable homes and thousands of job opportunities for local people.

Built on the site of a former garage this project entailed demolition of an existing structure followed by the design and construction of a new 22-storey residential development. The new building offers 128 dwellings comprising 117 shared ownership flats,11 private sale flats in additional to one commercial unit.

The Kier team developed an alternative substructure scheme to cantilever the 72.75 meters tall building over two Victoria Line service tunnels and a Thames Water trunk sewer whilst keeping the structure within its tight footprint. Piled foundations were installed as close as possible to the tunnel exclusion zones and a cantilevered 1.5m raft foundation was cast over the tunnels to support the lower floors of the structure until the in situ concrete corridor walls had sufficient strength to transfer the loads back to the piles. This solution avoided substructure works outside the boundary and significant service diversions.

David McKenzie, managing director at Kier Construction London, South & Strategic Projects, said: “The handover of Millstream Tower marks another successful project in our long standing relationship with Newlon Housing Trust and forms an exciting new landmark in Tottenham Hale’s expanding community.

“I am especially proud of the design features on this building, the cantilever design over LUL lines and achieving a gold Secured by Design accreditation, as it demonstrates our teams’ expert capabilities in finding innovative building solutions to complex challenges on site through collaboration and the use of modern methods of construction.”

Ezinne Ogbonna, Business Development Director, Newlon Housing Trust said: “I am really proud to be providing new, high specification, affordable homes at the heart of one of London’s most exciting new town centres. Millstream Tower is located immediately adjacent to the area’s excellent public transport facilities and the project benefited from the innovative solutions developed by Kier in order to be able to work on a complex site situated at the heart of so much existing infrastructure.”

This is Kier’s seventh project completed for Newlon Housing Trust with previous projects including Repton Street providing 86 affordable homes in Limehouse and Glasshouse Fields which provides more than 200 affordable homes in Tower Hamlets.

Featured News

Specification news
Heat network handovers: who carries the can?

With Ofgem’s heat network regulations now in force and the deadline for registering...

Read More >>

Specification news
Reading the small print: Why Part L could catch...

With revised Building Regulations coming into force in March 2027, Paul Trace,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>