Planning secured for £85m Cambridge development

Latest News Tue, Dec 14, 2021 9:00 AM

Award-winning housebuilder, The Hill Group and its joint venture partner Marshall have secured full Reserved Matters planning for the second phase of the landmark Marleigh development, which will deliver a further 421 new mixed-tenure homes alongside a variety of new public spaces.

This new phase will run in conjunction with the current phase of the scheme, which aims to deliver 547 new homes and a wealth of community facilities, including a primary school, a nursery, a market square and a community centre over the next five years.

Andy Hill of Hill Marshall LLP said: "We are delighted to have secured planning for the delivery of more homes and community facilities in this exciting new neighbourhood in East Cambridge, which has attracted a broad mix of buyers already.

"We have an unwavering commitment to supporting the wider Cambridge local economy, and it has been excellent to see our efforts supported through this latest approval."

Construction will start on-site to build the homes in early 2022, when a mix of private and affordable apartments and homes will be delivered as part of the long term masterplan.

The properties have been designed to feature active frontages and views overlooking open landscaped spaces, helping to improve the indoor-outdoor connection and encourage people to have a better relationship with nature. In addition, every new home will feature a range of energy-saving and carbon reduction features, including fabric first designs, air-source heat pumps and photovoltaics.

The master plan has been guided by a strong landscape-led narrative and designed as a place where the city meets the country, offering higher density homes with easy access to the Cambridge countryside. As such, Phase 2 seeks to embrace this interplay between urban and landscape living with exceptional green spaces at the heart of the neighbourhood. These spaces encourage healthy lifestyles with a particular emphasis on creating a range of accessible outdoor areas, prioritising pedestrians and cyclists over cars.

This will include The Titch, a new garden square that will sit at the heart of the community for easy access by residents. It will provide amenity space, play areas with naturalistic play equipment appropriate to the setting, and SuDS features in landscape corridors to enhance the site's biodiversity gain.

Phase 2 has been underpinned by the vision and essential placemaking principles set out in the Design Code, created for the wider master plan. As a result, the material palette has been carefully chosen to comply with the Design Code and features a diverse range of high-quality brickwork in a range of colours and textures. These materials establish an exciting street scene and integrate with the emerging character that has been developed in Phase 1.

Extensive cycle parking provisions have been incorporated for all residents, including the apartment buildings, each with a dedicated secure bike store close to the entrance.

Richard Howe of Hill Marshall LLP added: "Our vision is to deliver a new vibrant and sustainable community at Marleigh, centred around exceptional shared facilities and green spaces. We are pleased to be working with Hill Group once again on this second phase and are very much looking forward to starting work on-site in the New Year."

The project team for Marleigh Phase 2 includes Terence O'Rourke, JTP LLP, Bradley Murphy Design and WSP.

Featured News

Specification news
Architects increasingly optimistic about workloads and...

The Royal Institute of British Architects (RIBA) has published the findings of its...

Read More >>

Specification news
National house prices rising overall for first time in...

The latest Royal Institution of Chartered Surveyors (RICS) Residential Market Survey...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>