Firms encouraged to bid for £500m worth of contracts at Euston station site

Latest News Mon, Feb 14, 2022 9:47 AM

HS2’s Station Construction Partner for Euston station, a joint venture between Mace and Dragados (MD JV), is ramping up procurement this month, as it starts to offer packages worth over £500 million to help deliver HS2’s brand-new station at Euston.

This represents the start of a multi-year programme of procurement to support development and delivery of the HS2 scheme.

The contracts include the procurement for the construction of the main substructure at the station, which will involve packages for piling, earthworks and reinforced concrete. In addition, MD JV is also looking to secure a subcontractor to deliver the main systems and mechanical and electrical and plumbing (MEP) packages for the station.

These Tier 2 contract packages will result in many other contracts flowing through the supply chain, giving opportunities to businesses large and small to participate in delivering HS2. This just one of the areas in which the HS2 project will be providing long-term work for businesses, providing stability and opportunities for growth.

HS2 Minister, Andrew Stephenson said: “HS2 has never just been about boosting transport - it’s also about driving business, creating long-lasting jobs and Building Back Better from the pandemic.

“This major investment shows we’re delivering on our promises to improve transport across the nation while providing opportunities for business and boosting the economy.”

Andy Swift, HS2 Project Client for Euston, said: “Our work to deliver HS2’s London terminus station at Euston will really ramp up over the next few years. We have been preparing the area for the construction of the new station, which will transform the Euston area, including delivering improved connections with the London Underground.

"We encourage businesses big and small to bid for these packages, and we are proud of the role that HS2 is playing in helping boost the UK economy after covid.”

MD JV took over the HS2 station site in 2020 and has already completed piling for the west wall of the station. Hundreds of jobs have already been supported on the project, and it is projected that these new contracts will support the 3,000 jobs that will be filled at peak to construct HS2’s Euston station.

Paul Leighton, Deputy Delivery Director, Mace Dragados JV, said: “Given the scale of the task at Euston, we’re in no doubt as to how important our supply chain is to our success. We’re looking for our suppliers to not only provide us with skilled team members that will help us grow in size and capability, but to bring ideas and innovations that will help us set standards in the industry. We’re excited to see the wider impacts of our procurement activities too, with opportunities for suppliers across the country helping to feed into the national levelling-up agenda.”

Featured News

Specification news
CRL Stone launches dedicated Silica Free & Low Silica...

CRL Stone has introduced a standalone brochure dedicated to its rapidly expanding...

Read More >>

Specification news
Tender price growth remains stable as weaker demand...

Tender prices increased by an estimated 0.7% between 2Q2026 and 3Q2026, according to...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

Housing Brochure Brochure

Housing Brochure
By Gerflor

Download Now >>

CSR Report 2025 Brochure

CSR Report 2025
By Gerflor

Download Now >>

Thomas Company Brochure Brochure

Thomas Company Broch...
By Thomas Panels and Pr...

Download Now >>

SCHOTT UK Ltd- Certificate of Approval Brochure

SCHOTT UK Ltd- Certi...
By SCHOTT UK Ltd.

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Purlins & Sections
Purlins & Sections

Purlins & Sections for every projectOur range of cold rolled purlins and structural sections...

Read More >>

Composite Systems
Composite Systems

Our composite systems combine an external sheet, insulation core and internal liner in a single...

Read More >>

TPP 1000-32 Reverse
TPP 1000-32 Reverse

TECHNICAL: LOADSPAN TABLES AND DIMENSIONSOur profiled sheet load/span tables provide guidance on the...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>