Latest News Mon, Mar 28, 2022 7:12 AM
The first CGIs of the residential development Lockside Wharf in Birmingham’s Jewellery Quarter have been released.
Property investment company Joseph Mews, which is working with London-based property development company Consortia Developments to bring the properties to market, have released the images this month.
Lockside Wharf, once called Scotland Works, is currently under development and will be a careful restoration of a historic Birmingham landmark situated along the city’s canal system.

The canal-side development, based on Scotland Street, was formerly offices and is a historic Victorian building, recognised as a hub of manufacturing in Birmingham since 1897.
Work has already begun to convert the site into 61 one, two and three-bedroom apartments, split across the restored old building and a brand-new building on the adjacent empty site. There will also be roof extensions, creating four penthouse-style apartments at the top of the development.
While one half of Lockside Wharf will be a complete restoration of the original structure, the other will be a newly developed structure on the neighbouring brownfield site.
The newly released images by Joseph Mews showcase what the inside of some of the apartments will look like, featuring designer Poggenpohl kitchens, quartz worktops and designer interior styling, as well as wine fridges and balconies.
The Joseph Mews Property Group, which officially launched at the start of the year, and was set up by former SevenCapital sales director Andy Foote, is proud to be helping Consortia Developments bring this product to market.
Andy said: “Throughout the development it will keep its ‘reclaimed aesthetic’ with exposed brickwork and steel sitting alongside Karndean flooring, state-of-the-art appliances and clean lines.
“It’s expected that Lockside Wharf will be a unique proposition for buy-to-let investors interested in Birmingham. The wider development is designed to appeal to the professional tenants flocking to Birmingham in search of work at some of the biggest companies in the city. We are looking forward to bringing these homes to the market, alongside Consortia Developments,” he said.
Lockside Wharf is expected to complete in the second quarter of next year.
Featured News
With Ofgem’s heat network regulations now in force and the deadline for registering...
With revised Building Regulations coming into force in March 2027, Paul Trace,...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Valley Through Range
By Filon Products Limit...
Safer Replacement St...
By Filon Products Limit...
A Smart Way to Refur...
By Filon Products Limit...
Site Assembled Roofl...
By Filon Products Limit...
Factory-Assembled Mu...
By Filon Products Limit...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...
Magply recovery and protection boards have been developed to meet the roofing industry needs for a...
Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...
CONSTRUCTION VIDEOS - LATEST VIDEOS
A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...