BAM confirmed for net zero carbon in operation school

Latest News Tue, Jun 21, 2022 5:48 AM

BAM has been appointed through the Department for Education’s high value framework to redevelop Fred Longworth High School in Tyldesley, in Wigan, Greater Manchester.

The £24m contract will see BAM create a three-storey teaching block, to be handed over in September 2023. It will be Net Zero Carbon in Operation.

BAM is utilising its in house expertise, taking on architecture, M&E, sustainability and fixtures and fittings responsibility thanks to its integrated capabilities from BAM Design, while Hydrock is providing fire and acoustics, Nexus delivers ICT, and Dally Henderson Landscape.

The second phase involves the demolition of the majority of the existing school and construction of new sports pitches. This part of the project is due to be ready for spring 2024.

The project would increase the capacity of the school from 1,275 students to 1,350.

Construction issues include BAM creating a new overlay on an existing campus while it remains live, retaining three existing buildings, placing emphasis on intelligent sequencing. The scheme builds on the DfE’s new approach to sustainability, further developing innovation and methods from the initial pathfinder projects. The school will in part be constructed over Hindsford Brook culvert. Enabling works include diverting a main sewer running across the site and posing a critical constraint.

Restricted access means BAM will develop carefully co-ordinated traffic access and logistics plans and it has already taken steps to reduce deliveries and thus carbon emissions by increasing storage solutions on site.

A major part of the works includes dealing with matters in the ground including contamination and Japanese knotweed, and new services and drainage are required. Trees will also be protected.

Regional Director for BAM Construction in the North West, Ian Fleming, said:

“We have a very strong track record in the education sector across the UK and here in the North West, where we have delivered education facilities serving some 7,000 students over the past five years alone [see table below].

“Our ability to create net zero schools and use modern techniques such as our suite of digital construction methods and off-site manufacture and assembly allows us to reduce risks to our people and speed up delivery for the school.

“I’m looking forward to seeing us make excellent progress and to working with our friends and partners at the school and drawing out some benefits for the community around us.”

Fred Longworth is one of four Wigan schools earmarked for redevelopment under the DfE’s £1bn School Rebuilding Programme.

Featured News

Specification news
Reading the small print: Why Part L could catch...

With revised Building Regulations coming into force in March 2027, Paul Trace,...

Read More >>

Specification news
James Hardie confirms UK supply continuity agreement...

James Hardie confirms that it has reached an agreement with Swisspearl for the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>