VolkerFitzpatrick and Kier JV (VFK) celebrate the launch of the Luton DART

Latest News Mon, Apr 3, 2023 6:03 AM

VFK, a Joint Venture between VolkerFitzpatrick and Kier is celebrating the full launch of the Luton DART, a fully automated and electrically powered people mover which connects Luton Airport Parkway station with London Luton Airport terminal.

The Luton DART (Direct Air-Rail Transit), which launched its 24-hour timetable this week, replaces the previous bus service and speeds passengers along the route in under four minutes.

The project was delivered by VFK for Luton Rising. The construction took place over four years in several phases, including the construction of the new Luton DART Parkway station, as well as a dedicated central terminal station.

The cable-driven system designed by Doppelmayr Cable Car uses the latest technology and innovation to transport passengers from the station to the terminal, operating seven days a week.

Other key elements of the project included a 310m viaduct running next to the existing rail line, the 750m gateway bridge which was constructed off-line and moved over the existing A1081 New Airport Way, and a 320m double-tunnel which required flexible formwork to achieve its curved geometry.

Striking architectural elements have also been incorporated into the design of the Luton DART, including iconic coloured canopies at both DART stations, and the installation of an active-LED system which illuminates the gateway bridge from below.

Chris Evans, managing director of VolkerFitzpatrick strategic projects, commented: “This exciting project has seen us utilise a combination of our expertise in highways, airports and rail infrastructure. By working safely and collaboratively to an exceptionally high standard, we are proud that the Luton DART will not only benefit airport passengers but also the people and businesses of Luton for years to come.”

Ross MacKenzie, managing director of Kier Infrastructure, said: “We’re proud to have delivered this landmark project alongside our joint venture partners, on behalf of Luton Rising. The work that our team has completed will transform the passenger experience, offering a faster and more convenient transfer service while improving accessibility and helping to support the future sustainable growth of London Luton Airport.”

Luton Rising CEO Graham Olver commented: “The Luton DART is a vital investment that signals our commitment to the ongoing success of the airport for the benefit of our passengers, airlines and the people of Luton. Everything that we do is aimed not only at supporting economic and employment growth but generating positive outcomes for the community and acting in an environmentally responsible way.”

The Luton DART project has supported the economic development of the local area by creating over 500 construction jobs and training 720 local people, of whom 40% were drawn from traditionally under-represented groups.

In December 2021, His Majesty, King Charles III paid a visit to the Luton DART as part of a wider visit to Luton. The King was one of the first people to travel on the system and made a special effort to speak with some of the many apprentices who have worked on the Luton DART project.

The electrically powered Luton DART also supports the future sustainable growth of London Luton Airport, by reducing the environmental impact of journeys to and from the airport and congestion on surrounding roads. In so doing, it will increase the rail modal share for passengers accessing the airport and support the Luton 2040 Vision for a carbon-neutral town.

Featured News

Specification news
Designs for Foster + Partners’ latest project in Hong...

Designs for Central Crossing – Foster + Partners’ latest project in Hong Kong –...

Read More >>

Specification news
Kier’s growth in water sector continues with £139m...

Kier has secured a £139m contract with Severn Trent to upgrade Wanlip Sewage...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Retirement & Care Brochure

Retirement & Care
By AKW

Download Now >>

Kitchens Brochure

Kitchens
By AKW

Download Now >>

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

MasterLine 8 Heritage Window and Door System
MasterLine 8 Heritage Window and Door System

MasterLine 8 is a high-specification, next-generation window and door system that delivers...

Read More >>

ConceptSystem 77 Heritage Window and Door System
ConceptSystem 77 Heritage Window and Door System

The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>