Latest News Wed, May 24, 2023 5:53 AM
Hundreds of high-rise buildings are being registered with the new building safety regulator as the stricter regime to protect residents begins.
Around 750 applications have been opened with the new Building Safety Regulator (BSR) since its registration process for high-rise buildings opened last month.
All high-rise residential buildings must be registered with BSR by law. Those responsible for the safety of buildings have until the end of September to register or face prosecution.
BSR is pleased with the early response from the building industry but is urging all owners and managers to act now. Up to 12,500 buildings in England are covered by the new regulator, set up in response to the Grenfell Fire tragedy and officially launched earlier this year.
BSR is an independent body set-up by the Building Safety Act 2022 and part of the Health and Safety Executive (HSE). Its launch is the biggest change in building safety for a generation.
HSE’s Director of Building Safety, Philip White, said: “We’re pleased with the early response from industry but I urge owners and managers to act now and register their buildings if they haven’t already done so. This is a legal requirement they will have to meet by the end of September.
“Registration is a crucial part of the new regime and our efforts to ensure residents of high-rise buildings feel protected and safe in their homes.”
High-rise residential buildings that are at least 18 metres in height or have seven or more floors containing at least two residential units must be registered with BSR.
Information on how to register and what details are required can be found here. Building owners or managers must provide the number of floors at or above ground level, height in metres, the number of residential units, and the year of construction.
Guidance on the key building information (KBI) that will also need to be recorded under the new building safety laws has now been published here. This KBI registration element will then be added to the HRB online registration portal later this summer, allowing sufficient time for owners and managers of buildings to submit their KBI by the end of September.
Featured News
A new CPRE report, produced with UWE researchers, has revealed a concerning picture...
Morgan Sindall Construction and the University of Oxford marked a significant...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Retirement & Care
By AKW
Kitchens
By AKW
Colorcoat HPS200 Ult...
By Tata Steel
Confidex® Guarantee...
By Tata Steel
Colorcoat Prisma® co...
By Tata Steel
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...
MasterLine 8 is a high-specification, next-generation window and door system that delivers...
The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...
https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....
A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...