High hopes for office building to renovate space for hybrid workers

Latest News Wed, Jul 12, 2023 6:41 AM

The prospect of a revival in office building activity driven by an upturn in extension and refurbishment work emerged as one of the most promising themes in the latest Glenigan Construction Industry Forecast 2023-25.

As companies seek to rebuild and reconfigure their business space to accommodate hybrid working, the offices sector can look forward to two years of growth with particularly strong opportunities in London.

After a dip in activity this year, Glenigan is forecasting that the value of underlying new office project starts (under £100 million) will rise by 19% next year to £6.14 billion and by a further 11% in 2025.

With some 40% of staff in the capital now involved in hybrid working and central London workers spending an average of just 2.3 days per week in the office, the growth of refurbishment work to adapt office space in the capital is a major source of new opportunities.

Indeed, extension and refurbishment work has grown significantly in recent years and accounted for 63% of underlying new office starts in London last year, compared to 58% nationally.

The scale of the office building work pipeline in London is reflected in Glenigan data. Based on pro-rata figures showing a strong start in the opening months of this year, the value of underlying office project approvals in the capital is set to rise to around £1,800 million in 2023, up from around £1,550 million last year.

The message from major quoted property developers in the capital reflects the positive trends in the sector. Toby Courtland, chief executive of Great Portland Estates (GPE), recently pointed to an economic recovery underway in London where it has a £1.1 billion near-term development pipeline.

This includes a major 139,900 sq ft refurbishment of an office building at Minerva House in Southwark (pictured), where work is due to start later this year (Project ID: 21573497) and a 67,700 sq ft redevelopment on Piccadilly, where it has secured planning permission (Project ID: 20399112).

Meanwhile, GPE has a target to increase its Flex, serviced office space offering – which is suited to hybrid working – from a current level of 250,000 sq ft across 17 buildings in London to more than 600,000 sq ft.

Demand for Grade A space

Growing demand for premium, Grade A, office space which is energy-efficient and offers attractive surroundings which appeal to hybrid workers is also generating new construction opportunities.

To meet the demand for prime, sustainable new headquarters space, GPE is preparing four near-term schemes which will provide 917,800 sq ft of space and include its major project at 2 Aldermanbury Square (Project ID: 21166709).

Another quoted property group, Landsec, also sees significant development opportunities in the capital. The group has a 1.1 million sq ft consented office pipeline in the West End and Southwark which it says is deliverable into ‘a window of a significant shortage of sustainable Grade A supply’. Landsec may also raise finance for opportunities which could include acquiring and upgrading ‘well-located London offices in need of repositioning.’

Landsec has recently appointed Overbury as the main contractor on a £29.99 million office refurbishment at 5 New Street Square in the City of London. Work is due to start this coming September and includes the decarbonisation of the building by replacing gas boilers with air-source heat pumps (Project ID: 23136624).

Beyond the capital, the new office construction pipeline is looking healthier in Scotland, the West Midlands, and the East Midlands.

North of the border, the value of underlying new office approvals is set to almost double to over £400 million this year, based on pro-rata figures. One major project in Glasgow where plans have recently been unveiled involves a £60 million refurbishment of the Met Tower in North Hanover Street to create a new tech and digital hub. Work on the scheme of over 34,000 sq m could start early next year (Project ID: 22173291).

Featured News

Specification news
Boyd Group inspects 75 fire doors using Fireco’s...

The Boyd Group is a family-run fire safety and compliance company providing training,...

Read More >>

Specification news
Delayed decisions on higher-risk building applications...

The Health and Safety Executive (HSE), acting as the Building Safety Regulator (BSR),...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

Colorcoat HPS200 Ultra® colour card Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

ParallelRoof 100
ParallelRoof 100

ParallelRoof 100 is a non-insulated conservatory system that provides the perfect solution for any...

Read More >>

MasterLine 8 Heritage Window and Door System
MasterLine 8 Heritage Window and Door System

MasterLine 8 is a high-specification, next-generation window and door system that delivers...

Read More >>

ConceptSystem 77 Heritage Window and Door System
ConceptSystem 77 Heritage Window and Door System

The ConceptSystem 77 system incorporates a comprehensive range of inward- and outward-opening window...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>