Kier appointed to deliver net zero carbon in operation secondary school

Latest News Fri, Aug 25, 2023 7:02 AM

Kier has been appointed by the Department for Education (DfE) to deliver the redevelopment of Oak Academy in Bournemouth.

A new campus design for the 900-place secondary school will replace the existing buildings on site, have a more concise and efficient layout, and will provide a variety of learning spaces, including science and technology classrooms and improved facilities to cover sport, music, drama and SEND provision.

Oak Academy will be net zero carbon in its operation, in line with the DfE’s latest output specification requirements. It will be a thermally efficient building incorporating the use of air source heat pump technology and a full bio-solar roof incorporating photovoltaic panels.

The project is funded through the DfE’s School Rebuilding Programme, which was announced in 2020, and is addressing either the rebuilding or major refurbishment of 500 schools with the highest condition need.

The building has been designed using Kier’s kSchool design platform to reflect the school’s desire to serve as the heart of the community. The H-shaped layout centres around an open dining space with glazed elevations, adjacent courtyards to encourage socialising and learning, and configurations to allow the school hall, sports hall and changing facilities to be used by the wider community after hours.

Kier is committed to providing support to the school throughout the design, build, handover and post occupancy phases to ensure that they derive the maximum benefit and most efficient operation from their new building.

Mark Norris, operations director at Kier Construction London & Southern, said: “We are delighted to be appointed by the Department for Education to create a new home for Oak Academy, one which will deliver improved, sustainable facilities for students, staff and the community.

“This innovative net zero carbon in operation project will combine improved facilities under one roof, making more efficient use of the site’s footprint and allow the school to increase its student and staff intake.

“We look forward to using our wealth of first-class education facility experience to bring this project to fruition, positively impacting the wider community and its next generation of talent.”

Oak Academy is part of the Ambitions Academies Trust, a multi-academy trust serving schools in or close to the Bournemouth and Weymouth areas. The Trust’s Chief Executive Officer (CEO), Principal and Directors have been involved with the project from the start.

Sian Thomas, CEO at Ambitions Academies Trust commented: “We are excited that Oak Academy will have a new school with such superb facilities. Ensuring that future generations will have a great school in which to thrive is so important and means a lot to the whole community.”

This appointment is the latest appointment for Kier on the Department for Education Construction framework and further strengthens its position as a leading provider of educational facilities across the UK. Recent appointments include Emmanuel School, a new sustainable community primary school in Havering; Carew Academy, a new SEND school in Wallington; Katharine Lady Berkeley's School, a partial rebuild project in Wotton-under-Edge; and Thomas Keble School, a new secondary school in Gloucester.

Featured News

Specification news
Full Roofing Package — Gloucester Rugby Club

This project involved the supply of a full roofing package for Gloucester Rugby Club,...

Read More >>

Specification news
Five construction trends to watch in 2027

Experts featured in the latest episode of MEDITE SMARTPLY’s Beyond the Board...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>