Government warned to take urgent action on the condition of public buildings

Latest News Tue, Sep 5, 2023 6:04 AM

RIBA has renewed its call on the Government to take immediate steps to rectify the problems caused by the use of the Reinforced Autoclaved Aerated Concrete (RAAC) in all public buildings.

It has made repeated warnings about the dangerous condition of England’s school estate and the Government is facing mounting criticism that it has ignored the issues for too long.

RIBA Chair of Board Jack Pringle said: “RIBA has long voiced serious concerns about the condition of school buildings. Our 2016 study – Better Spaces for Learning – highlighted that pupils and teachers are struggling to learn and teach in conditions damaging to their health and education.

“Alongside funding the mitigation of immediate safety risks through an industry-led task force, the Government must publish the Condition of Schools Survey without delay, to expose the full scale of this problem.

“It’s also clear however that RAAC failure goes beyond schools, and that’s why the Government must undertake an urgent audit of public buildings to identify how widespread it really is.

“Once immediate safety risks have been resolved, we need to look to the future. We must make sure this doesn’t happen again – learn from mistakes, ensure all products are safe, and have a programme of work to upgrade buildings as they reach the end of their life. The mobilisation of private finance will be key to achieving this.”

Education Secretary Gillian Keegan has now issued a statement to MPs on new guidance on RAAC in education settings.

“All schools and colleges that have advised us they suspect they might have RAAC will be surveyed within a matter of weeks – in many cases, in a few days,” she said. “Most suspected cases will not have RAAC – so far, when we have surveyed schools, around two-thirds of suspected cases do not have RAAC.

“We will follow the same approach with any new cases through the professional survey programme.

“The vast majority of schools will be unaffected and children should attend school as normal unless parents are contacted by their school.”

The minister confirmed a list of schools affected by RAAC will be published this week, with details of initial mitigations in place. After this, the Government will provide updated information as new cases of RAAC are confirmed and existing cases resolved.

She said each impacted school and college has a dedicated caseworker to help implement a mitigation plan.

“In terms of funding, as the Chancellor said, we will spend whatever it takes to keep children safe,” the minister continued.

“This includes paying for the emergency mitigation work to make buildings safe, including alternative classroom space, where necessary. Where schools need additional help with revenue costs, like transport to other locations, we are actively engaging with every school affected to put appropriate support in place.

“We will also fund the longer-term refurbishment or rebuilding projects where these are needed, to remove RAAC. Professional advice from technical experts on RAAC has evolved over time.”

The Government is now also facing calls for greater transparency as regards the use of RAAC in other public buildings, including hospitals and health centres, courts and civic places.

Featured News

Specification news
Heat network handovers: who carries the can?

With Ofgem’s heat network regulations now in force and the deadline for registering...

Read More >>

Specification news
Reading the small print: Why Part L could catch...

With revised Building Regulations coming into force in March 2027, Paul Trace,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>