Planning for climate impacts falls short once again

Latest News Wed, Mar 13, 2024 8:04 AM

February 2024 was the warmest on record. In the UK, it was the fourth wettest February ever recorded.

Climate change is now bringing major challenges to the UK, but the CCC’s assessment of the Government’s Third National Adaptation Programme (NAP3) is that it falls far short of what is required. Evidence of the UK’s inadequate response to worsening climate impacts continues to mount.

Published in July 2023, NAP3 is the UK Government’s statutory plan to ensure the country is prepared for the effects of climate change. It improves upon previous programmes, but its key failure remains the absence of a credible vision for a well-adapted UK, resilient to the climate risks now facing British people and businesses.

Baroness Brown, Chair of the Adaptation Committee, said: “The evidence of the damage from climate change has never been clearer, but the UK’s current approach to adaptation is not working.

“Defra needs to deliver an immediate strengthening of the Government’s programme, with an overhaul of its integration with other Government priorities such as Net Zero and nature restoration. We cannot wait another five years for only incremental improvement.”

NAP3 contains a commitment to an evolving programme over its lifetime. This should be acted on as soon as possible. The NAP3 programme is based largely on existing policy or mechanisms. That means that less than half of the short-term actions to address urgent risks identified in the last Climate Change Risk Assessment are being progressed. There are critical issues which need to be resolved:

  • Governance. Over three iterations of the NAP, Defra has failed to make adaptation a top priority within the department or in other central government departments, despite the growing evidence of climate impacts. It is still not sufficiently well-understood or resourced, particularly in local government. The present approach of coordination by Defra is not working. Effective cross-Government collaboration is needed to ensure all departments are engaged with adaptation and recognise the challenges that climate impacts can have across multiple sectors at any one time.
  • Investment. Adaptation in the UK is insufficiently funded to manage the scale of the climate impacts we will experience. NAP3 does not tackle effectively the barriers to investment, such as low perceived urgency of adaptation, lack of clear targets and the limited understanding of adaptation actions. There also remains a limited understanding on the role of spending on adaptation from the private and public sector.
  • Monitoring. The CCC cannot fully assess progress without better monitoring and evaluation. A system of comprehensive indicators and data collection is vital and – as seen in other countries – it improves the response to climate impacts.

There is currently a window to build more effective climate resilience in the UK. Long-term decisions are being taken on the new Environmental Land Management Scheme, there are new price control periods for energy, water and rail, which could accommodate effective resilience standards to manage future climate risks. These opportunities must be grabbed before another window for meaningful change closes.

Since the publication of NAP3, there has been international agreement on the framework for the Global Goal on Adaptation at COP28. Despite the UK being an important player in the negotiation of this, the current NAP does not meet the targets within the new Framework in full.

The NAP’s status across Government remains too low. It must be strengthened to make it fit for the gravity of known climate risks in the UK.

Featured News

Specification news
Mace completes new AstraZeneca facility ‘The Hub’...

Mace, the global consultancy and construction company, has completed its latest...

Read More >>

Specification news
BPMA stresses the critical role of energy audits in...

The British Pump Manufacturers Association (BPMA) is calling on businesses across the...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>