Archaeology work underway ahead of regeneration

Latest News Fri, Apr 5, 2024 6:18 AM

The Hill Group, and its commercial specialist partner, Shearer Property Group (SGP), have commenced archaeological works ahead of the first phase of development of City Centre South, a landmark £450m regeneration scheme that will transform Coventry city centre.

These essential preliminary works will ensure the heritage of the site is understood, recorded, and preserved prior to the start of construction.

A team of archaeologists from Cotswold Archaeology has begun a survey of the site with trenches taking place in various locations, starting in the Barracks car park before moving to Bull Yard and Shelton Square.

The works are estimated to take seven to eight weeks to complete, and disruption to businesses and visitors will be kept to a minimum. The task will include the excavation of 23 trial trenches of varying sizes and depths, seeking to locate the line of the historic city wall as well as identify any other archaeological remains. Items of significance found during the works will be logged, protected, and covered for further investigation until the site has been cleared.

Hill and SGP are working closely with Coventry City Council and West Midlands Police to ensure that emergency protocols are in place should the trenching unearth any unexploded ordnance that remains as a result of the city’s bombing during the Second World War.

Andy Fancy, Managing Director at The Hill Group comments: “We are committed to carrying out the archaeological investigation works at City Centre South both safely and sensitively to protect any historical findings before the start of construction. These works are a routine part of the development process and essential due to the development’s location at the heart of Coventry’s historic centre.”

Visiting the site as the dig began, Councillor Jim O’Boyle, cabinet member for jobs, regeneration, and climate change at Coventry City Council said: “I’m pleased that this work is underway – along with the work to relocate Shopmobility to a new location at Salt Lane car park it’s the first visible work on site."

“This work to map and record information is important and Hill and SPG are very experienced so I’m sure it will be done efficiently and carefully with the data used to help support future stages.”

Almost a thousand homes have been given the green light in this first phase of City Centre South, including 200 affordable homes, along with space for shops, businesses, and public open space in a pedestrian-friendly quarter. The new development, designed by acclaimed architecture firm Allies and Morrison, introduces a contemporary style that takes its inspiration from Coventry’s heritage. Conveniently located within a five-minute walk of Coventry train station, the development forms a major element of the wider masterplan for the regeneration of the city.

Construction at City Centre South is scheduled to start in the autumn, with the first homes expected to be completed in early 2027.

Featured News

Specification news
Transformative project delivers 204 modern apartments

A transformative project to deliver more than 200 modern apartments has been...

Read More >>

Specification news
Exploring and shaping tomorrow - Future Business of...

The Royal Institute of British Architects (RIBA) has launched an evidence-based,...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

Colorcoat HPS200 Ultra® colour card Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

PAVAFLEX
PAVAFLEX

A flexible, natural and ecological thermal insulation board based on wood fiber. PAVAFLEX is placed...

Read More >>

SOPRALENE FLAM 180 TF
SOPRALENE FLAM 180 TF

SOPRALENE FLAM 180 TF is composed of elastomer modified bitumen and a non woven polyester...

Read More >>

SOPRALENE OPTIMA C3 GmF
SOPRALENE OPTIMA C3 GmF

Membrane composed of elastomer modified bitumen and a composite polyester reinforcement. Used as an...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>