Grenfell Tower memorial design team selection process launched

Latest News Wed, Jul 10, 2024 8:06 AM

The Grenfell Tower Memorial Commission and the Royal Institute of British Architects (RIBA) have launched the process to select the team that will design the future memorial on the site of Grenfell Tower.

This is a hugely significant step in the Memorial Commission’s journey to create a bold, fitting, and lasting memorial to remember the 72 victims who lost their lives in, and those whose lives were forever changed by, the devastating Grenfell Tower fire.

The Commission’s publication of their design brief provides the criteria that interested teams must meet, and details about how they can apply. Teams are being asked to demonstrate their relevant, professional and specialist expertise including architecture, landscape architecture, and structural and mechanical engineering. Teams must also have strong experience of working collaboratively with communities.

Image: Zute Lightfoot, ACAVA Shoots

A shortlist of up to five teams will be notified in the autumn. These teams will be asked by the Commission to prepare the design approach they would take if appointed. With direct input from the Grenfell community, the final team is expected to be selected and announced in spring 2025. It is anticipated that the memorial design should be sufficiently developed, in partnership with the community, to allow for a planning application in 2027.

In November 2023, the Grenfell Tower Memorial Commission published its second report, detailing the Grenfell community's wishes for a permanent memorial. The report called on the government to honour its earlier commitments and fulfil its moral duty to deliver all sixteen of the Commission’s recommendations.

Among the recommendations, are: 

  • The Grenfell community must always be central to decisions about the memorial. 
  • The memorial must be a peaceful, sacred space for individual and communal remembrance and reflection. 
  • The design must reflect the diverse faiths and cultural backgrounds of the Grenfell community. 
  • The memorial should include a garden, a monument or other structure, and options for commemorating the names of those lost, featuring art, water, and light. 

The Grenfell Tower Memorial Commission’s ten community representatives, said: “Launching the memorial design team selection process brings us a significant step closer to turning the Grenfell community’s memorial vision into a physical reality.

“Through this process, we intend to identify and appoint a specialist and worthy design team. A team that has proven experience of working on sensitive and community-focused projects, and who can clearly demonstrate the integrity with which they will approach this vital task.

“The beautiful and lasting memorial to our 72 loved ones deserves nothing less.” 

Thelma Stober and Lord Paul Boateng, co-chairs of the Grenfell Tower Memorial Commission said: “Our primary commitment as the Commission is to establish a dignified and peaceful space for the Grenfell community to commemorate. 

“And our fundamental pledge, from the outset, has been to prioritise the voices and wishes of the entire Grenfell community in the decision-making process, both now and in the future. 

“The bereaved, survivors, and the broader Grenfell community will play integral roles at every stage. This will ensure that the final design embodies a truly meaningful tribute to the 72 lives lost and provides a lasting and appropriate place for loved ones to pay their respects, mourn, and feel connected to their memory.” 

Jane Duncan OBE PPRIBA, RIBA Competitions Architect Adviser, Past-President of RIBA and Chair of RIBA’s Fire Safety Expert Advisory Group since 2017, said: “Any process to design a memorial is a huge challenge, but the Grenfell Tower tragedy struck a blow so deeply sad, so shocking and so intense into hearts all around the globe, that to find the right design team, able to draw upon their deepest streams of empathy and delicacy, is a tricky task.

“This incredible and unique design team selection process sits naturally on an international stage, just as the tragedy resonated far across the globe.

“I ask all architects and designers, wherever you may be, to consider if you have the right skills and experience in dealing with many and diverse stakeholders, in sensitivity of approach and compassion, as well as the innovation and creativity to interpret and deliver a wonderful design to meet a very personal and touching brief.

“This selection process is a wonderful opportunity to present your most well-rounded team, and express your capabilities, your openness, your imagination, and actually, also, your humanity. We look forward to hearing from you.”

Submissions for Phase 1 must be received by Wednesday 18 September 2024. You can find out more information at: www.grenfelltowermemorial.co.uk/design

Featured News

Specification news
CROSS-UK named as the official Voluntary Occurrence...

The Health and Safety Executive (HSE), in its role as the Building Safety Regulator...

Read More >>

Specification news
Enhance your designs and spaces with JustArtificial

JustArtificial, established in 2004, is one of the UK’s leading suppliers of high...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Colorcoat HPS200 Ultra super durable case studies Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Confidex® Guarantee datasheet Brochure

Confidex® Guarantee...
By Tata Steel

Download Now >>

Colorcoat Prisma® colour card Brochure

Colorcoat Prisma® co...
By Tata Steel

Download Now >>

Colorcoat HPS200 Ultra® colour card Brochure

Colorcoat HPS200 Ult...
By Tata Steel

Download Now >>

Amtico Bio Support Document  Brochure

Amtico Bio Support D...
By Amtico

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

PAVAFLEX
PAVAFLEX

A flexible, natural and ecological thermal insulation board based on wood fiber. PAVAFLEX is placed...

Read More >>

SOPRALENE FLAM 180 TF
SOPRALENE FLAM 180 TF

SOPRALENE FLAM 180 TF is composed of elastomer modified bitumen and a non woven polyester...

Read More >>

SOPRALENE OPTIMA C3 GmF
SOPRALENE OPTIMA C3 GmF

Membrane composed of elastomer modified bitumen and a composite polyester reinforcement. Used as an...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Mira Vista Heatloop
Mira Vista Heatloop

Mira Showers is delighted to introduce the new Mira Vista HeatloopTM – an innovative and stylish...

Watch Now >>

Why our Canopies Last Longer
Why our Canopies Last Longer

https://www.aandslandscape.co.uk/ Find out why A&S Landscape Canopies last longer than alternatives....

Watch Now >>

Enclosed Dining Canopy - Hampton Gardens School
Enclosed Dining Canopy - Hampton Gardens School

A&S Landscape designed and installed a large enclosed, curved roof canopy for Hampton Gardens School...

Watch Now >>