Willmott Dixon lands £31m Central Beds leisure facility

Latest News Fri, Aug 16, 2024 6:30 AM

Willmott Dixon has been chosen by Central Bedfordshire Council to build a new leisure centre in Clipstone Park, Leighton Buzzard, in a contract worth £31.5 million.

The company will start construction of the Leighton Leisure and Community Centre in October 2024, with Tiddenfoot Leisure Centre remaining open until the new centre is complete in Summer 2026 to ensure residents have continuous access to leisure facilities.

The new leisure centre will provide residents with a range of high-quality, modern sports and community amenities to meet the needs of Leighton-Linslade’s growing population. It will accommodate a significantly increased scale of facilities including a large health and fitness area (gym), and significantly increased pool space with an eight lane 25metre pool, a learner pool and a confidence pool; offering swimming options for all age groups.

The building has been designed to minimise energy consumption and reduce carbon emissions. It will feature electric car charging points and improved access to sustainable travel options, aligning with the Council's Sustainability Strategy and its goal of achieving being carbon-zero by 2030.

Stewart Brundell, managing director at Willmott Dixon: “We are looking forward to starting on site to begin the construction of the Leighton Leisure and Community Centre. This is a project that promises to significantly enhance the quality of life for the local community. The state-of-the-art facility will provide a hub for health, wellness, and recreation, fostering a stronger and vibrant community feel and create a lasting impact which will benefit residents for generations to come."

The existing sports hall and squash courts at the Tiddenfoot site are an integral part of Cedars Upper School and as such will remain open and available for residents to use and enjoy after the new leisure centre has been opened.

Featured News

Specification news
Proctor Air® Provides Peace of Mind for Apartment...

A significant challenge when working on the roof of any existing, occupied building...

Read More >>

Specification news
Probreathe A2® - Awarded BBA Certification

The Proctor Group, a leader in specialist membranes, is proud to announce that...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

Vertical Sliding Sash Window Brochure

Vertical Sliding Sas...
By Epwin window systems...

Download Now >>

Two-Part Cill System Brochure

Two-Part Cill System
By Epwin window systems...

Download Now >>

 Spectus Ovolo  Windows and Doors Brochure

Spectus Ovolo Wind...
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

A responsible addition: HIMACS shapes are now SCS-Certified for recycled content
A responsible addition: HIMACS shapes are now SCS-Certified for recycled content

HIMACS has long been the solid surface material of choice for architects and designers looking for a...

Watch Now >>

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>

Sustainable Energy Efficient Solutions
Sustainable Energy Efficient Solutions

From radiators and underfloor heating to ceiling convectors and towel warmers, Myson is the UK’s...

Watch Now >>