HS2 celebrates first completed viaduct

Latest News Wed, Sep 4, 2024 5:33 AM

A viaduct in Northamptonshire has officially become the first on the HS2 project to be completed as engineers working for the high speed rail project installed the last stretch of parapet along the sides.

The 163m long Highfurlong Brook Viaduct, near the village of Aston le Walls, is one of more than 50 being built as part of the new rail project, which is designed to improve journeys between London and the North, while freeing up space on the most crowded part of the existing West Coast Mainline for more freight and local services.

Consisting of seven spans, the viaduct crosses Highfurlong Brook’s floodplain at a height of around 9m. Each span is made up of four beams weighing up to 56 tonnes and were lifted into position last year to form the backbone of the structure.

Each of the beams – which are up to 25m long - were manufactured off site before being delivered over night to reduce disruption for local road users. The deck – which will support the track and electrical systems – was poured in situ earlier this year, with the parapets along each side manufactured off site and installed over the last four months.

The viaduct is one of around 500 bridging structures on the HS2 project which range from small road bridges and drainage culverts to massive viaducts like the record-breaking Colne Valley Viaduct which will become the longest in the UK when its deck is completed.

Bill Price, HS2 Ltd’s Project Client said: “The completion of our first viaduct is a major moment for the HS2 project and I’d like to thank everyone in our integrated project team and supply chain partners who have worked so hard to get us where we are today.

“It’s great to see Highfurlong Brook finished and I look forward to seeing many more of our viaducts, bridges, stations and tunnels come together over the next few years.”

Highfurlong Brook was delivered over two years by HS2’s main works contractor EKFB – a group made up of Eiffage, Kier, Ferrovial Construction and Bam Nuttall. The design was done by EKFB’s design partner ASC working with architect Moxon.

With the viaduct now structurally complete, the next phase of construction will include delivering the earthworks that support the railway at either end before a separate set of contractors comes in to install the rail systems, including track, signalling, power and communications systems.

HS2 between London and the West Midlands is expected to start operation between 2029 and 2033.

Scott Corsar, EKFB’s Project Manager said: “We have achieved many ‘firsts’ with Highfurlong Viaduct, from the first viaduct to have its full deck installed to the first structurally complete viaduct on the HS2 programme following the recent installation of 136 parapets.

“This would not have been possible without the hard work, consistency and collaboration of everyone involved with the structure, from our designers down to our operatives out on site.”

Featured News

Specification news
STA release a guide to commercial viability for...

The Structural Timber Association have released their ‘Guide to Commercial...

Read More >>

Specification news
Report calls for reform to planning system for UK’s...

CPRE has released a new report, alongside the Aldersgate Group and RenewableUK, which...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>