Latest News Mon, Jan 20, 2025 6:54 AM
The new BS 9991:2024 – Fire safety in the design, management and use of residential buildings – was published on 30 November 2024, which the BSI states supersedes BS 9991:2015.
BS 9991:2024 does not reference the transitional arrangements for amendments to Approved Document B.
Build UK says this has created some confusion for those preparing applications for Building Control Approval and basing their fire safety designs on the recommendations made within BS 9991:2015. Applications for Building Control Approval must demonstrate how they will meet the functional requirements of the Building Regulations 2010.

The Building Safety Regulator (BSR) has confirmed that in accordance with Regulation 7 of The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 it will assess applications for Higher-Risk Buildings (HRBs) against the functional requirements of the Building Regulations 2010.
Non-HRB applications to Building Control Bodies are expected to be treated in the same way. Approved Documents provide general guidance on how to comply with the Building Regulations in common situations; however, applicants can present other ways to comply with the functional requirements.
British Standards are voluntary standards providing further guidance and are not mandatory. It is important to note that the Building Regulations 2010, which contain the functional requirements, have not changed.
Under The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, applications to the BSR require a Building Regulations Compliance Statement, which is expected to include:
Approved Document B continues to reference BS 9991:2015 and Question 23 in Approved Document B: Fire safety - Frequently Asked Questions states: “When an approved document refers to a named standard, the relevant version of the standard is listed at the end of the approved document. Until the approved document is amended, these references are part of the guidance approved under section 6 of the Building Act.
“If work complies with the guidance referred to in the approved document, that makes it likely that the work conforms with the relevant requirements of the Building Regulations. Following other guidance would not provide that legal protection.
“If an approved document refers to an older version of a standard that the issuing standards body has now revised or updated, the new version may be used as a source of guidance, provided it continues to address the relevant requirements of the Building Regulations.”
The BSR has confirmed to Build UK that until further notice applications for Building Control Approval for HRBs can refer to BS 9991:2015 and/or 2024 as the guidance or standard used to support designs
Featured News
The Royal Institution of Chartered Surveyors (RICS) has launched a consultation for a...
Around 5,000 new prison places are under construction – including in the North...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
ACO Blue Roof Guide...
By ACO Building Drainag...
Stannah Commercial B...
By Stannah Group
Levelmaster
By Stannah Group
Trolleylift
By Stannah Group
Stannah Midilift CLS
By Stannah Group
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Our carefully curated range of handmade roofing tiles and slates is specifically designed to...
Special-shaped bricks are specifically designed to feature a variety of shapes and dimensions that...
Brick slips manufactured from genuine clay bricks are available in rustic, traditional, and...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Reclaimed Brick Company is part of Leah's Yard Square in Sheffield, a historic site revitalised for...
A typical day at a reclamation yard is filled with activity and discovery. Early mornings often...
Reclaimed Brick Display at Reclamation Yard