Government decides to dismantle Grenfell Tower

Latest News Mon, Feb 10, 2025 7:18 AM

The Deputy Prime Minister has met bereaved families and survivors of the Grenfell Tower tragedy, and written to both them and residents in the immediate community, to share her decision that Grenfell Tower will be carefully taken down to the ground.

This is a deeply personal matter for the people affected and the Deputy Prime Minister is committed to keeping their voice at the heart of this process. She recognises how difficult it is for them and her priority has been to let them know her decision first.  

The Deputy Prime Minister has prioritised engagement with the community since her appointment in July and has met bereaved families, survivors and residents in the immediate community.

Image: Zute Lightfoot, ACAVA Shoots

In November last year, the Deputy Prime Minister explained to families that she would listen to their views and consider expert information before making a decision on the future of the Tower in February. From November she offered bereaved and survivors the opportunity to meet in-person in North Kensington and Whitehall, or online, at different times and individually when families felt more comfortable with this. She has also spent time with representative groups, residents’ associations, schools and faith leaders. She is grateful to everyone who shared their view – whether directly with her, with the Minister or officials – and especially to the bereaved and survivors.  

The Tower was the home of the 72 innocent people who lost their lives, and of survivors whose lives were forever changed. It is clear from conversations it remains a sacred site. It is also clear that there is not a consensus about what should happen to it.

For some, Grenfell Tower is a symbol of all that they lost. The presence of the Tower helps to ensure the tragedy is never forgotten and can act as a reminder of the need for justice and accountability. Being able to see the Tower every day helps some people continue to feel close to those they lost. For others it is a painful reminder of what happened and is having a daily impact on some members of the community. Some have suggested that some floors of the Tower should be retained for the memorial, others have said that this would be too painful.

The Deputy Prime Minister has considered independent expert advice. Engineering advice says that the Tower is significantly damaged. It remains stable because of the measures put in place to protect it but even with installation of additional props, the condition of the building will continue to worsen over time. Engineers also advise it is not practicable to retain many of the floors of the building in place as part of a memorial that must last in perpetuity.

Taking the engineering advice into account the Deputy Prime Minister concluded that it would not be fair to keep some floors of the building that are significant to some families, whilst not being able to do so for others and knowing that, for some, this would be deeply upsetting.

In a statement, CIBSE said: “The tragedy of Grenfell Tower remains an enduring reminder of the critical importance of fire safety in the built environment.

“The government’s decision to dismantle the tower following warnings about its potential structural instability due to fire damage is deeply sensitive, and we acknowledge the range of emotions and views expressed by the bereaved, survivors and the local community.

“As a global institution committed to building safety, we recognise the importance of ensuring that any action taken is carried out with transparency, respect and the involvement of those most affected. Grenfell must remain a catalyst for change, driving improvements in fire safety regulations, building standards and accountability across the industry.

“CIBSE remains steadfast in our commitment to learning from Grenfell and working with policymakers, industry professionals and the wider community to ensure that such a disaster never happens again.”

The government is committed to taking the next steps respectfully and carefully. There will be continued support for, and engagement with, the community throughout the process. There will be no changes to the Tower before the eighth anniversary. 

In the coming months, the government will confirm the specialist contractor that will develop a detailed plan for taking the Tower down. The work will be led by technical experts with specific health and safety responsibilities and will include a methodology that includes environmental, health and safety measures and a detailed programme of work. It will likely take around two years to sensitively take down the Tower through a process of careful and sensitive progressive deconstruction that happens behind the wrapping.

We continue to support the independent Grenfell Tower Memorial Commission as the community choose a design team to work with them on designing a memorial. The Deputy Prime Minister will ensure that materials from the site, communal areas of the Tower, or parts of the Tower can be carefully removed and returned for inclusion as part of the memorial, if the community wishes.

The department has regularly consulted the Metropolitan Police, HM Coroner and the Grenfell Tower Inquiry to ensure decisions about the site do not interfere with their important work in pursuit of justice and accountability. The Police and HM Coroner have again recently confirmed they have everything they need.

The Deputy Prime Minister’s commitment to the community continues. She will ensure bereaved families, survivors and residents continue to have opportunities to speak with her and the Building Safety Minister on issues that matter to them most.

Featured News

Specification news
RIBA partners with government on design ideas...

RIBA has announced a new collaboration with the Department for Science, Innovation...

Read More >>

Specification news
DHF launches new best practice guide to help members...

The Door & Hardware Federation (DHF) has published a new Best Practice Guide, A...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Paints & Coatings Brochure

Paints & Coatings
By F.H. Brundle

Download Now >>

Cedral Roofs Brochure Brochure

Cedral Roofs Brochur...
By Cedral by Etex

Download Now >>

Cedral Facades Brochure Brochure

Cedral Facades Broch...
By Cedral by Etex

Download Now >>

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Aluminium Framing System
Aluminium Framing System

Benefits: Decking and BeyondThe benefits of aluminium framing systems: Why Outdure® Qwickbuild®...

Read More >>

Aluminium Fencing
Aluminium Fencing

When it comes to securing your property while enhancing its aesthetic appeal, few fencing solutions...

Read More >>

Adjustable Pedestals & Paving Supports
Adjustable Pedestals & Paving Supports

The smarter, faster way to lay perfectly level decking, paving, and flooring on any surface.Whether...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>