GOLDBECK completes landmark “Hive” facility at logistics hub

Latest News Thu, Oct 29, 2026 7:02 AM

GOLDBECK has completed “The Hive”, a new amenity building at DP World London Gateway logistics hub in Stanford-le-Hope, Essex.

The company delivered the scheme as a central meeting point for the businesses on site and the surrounding community.

Stanford-le-Hope, 28. 10 2026. Known as “The Hive,” the development was constructed on Ocean Boulevard at DP World London Gateway, Stanford-le-Hope, designed to serve both occupiers within the port and logistics park, as well as the wider community.

“The Hive supports the day-to-day needs of businesses operating within the DP World London Gateway site while also creating a space that extends beyond working hours. The building will serve a wider purpose to the community making it a shared space for business and residential use,” said Dan Bennett, Head of Project Management Logistics at GOLDBECK in the UK.

Image: SHEDSHOOTERS

The facility provides a mix of office accommodation, shared workspaces and food and beverage areas, alongside breakout zones designed to encourage interaction and collaboration. At its core, a full-height atrium spans all levels, creating a strong visual connection throughout the building and drawing natural light deep into the internal spaces. With a total floor area of just over 1,500 square metres across three levels, The Hive represents a compact, but highly impactful development.

In addition to the workplace, the scheme introduced a range of wellbeing and leisure facilities, including a gym, a multi-use games area (MUGA) and a padel court, with provision for a creche at a later stage. Several of these amenities have been made available to the local community outside standard operating hours, reinforcing the building’s role as more than just a workplace facility.

The building was designed to create a strong architectural presence. The Hive features a full-height structural glazed façade, complemented by copper-clad reveals. These elements are enhanced by recessed architectural lighting, giving the building a distinctive appearance after dark.

The wider façade continues the copper cladding theme, combined with curtain walling to create a consistent and contemporary aesthetic. The design was developed by Stephen George & Partners LLP, acting as CDM principal designer.

Access and movement around the site were carefully integrated into the overall scheme. Visitors approaching The Hive now cross a purpose-built pedestrian footbridge and cycleway, designed to provide a safe and welcoming route into the building. The bridge incorporates a timber-capped mesh balustrade, integrated lighting and resin-bound gravel finishes, creating a clear transition from the surrounding infrastructure into the amenity space.

Cycle storage, sheltered seating and clearly defined external routes further support accessibility and encourage sustainable travel options.

Internally, the building delivers a flexible and contemporary environment. A combination of glazed partitions, folding elements and dry-lined walls allows for a range of uses, accommodating both private office spaces and shared environments. Exposed structural steelwork and building services contribute to a modern industrial aesthetic

The central atrium forms the focal point of the building, extending through all floors to the underside of the roof, with suspended feature lighting enhancing the overall spatial experience.

External amenities and landscaping

The Hive extends beyond the building envelope, with a strong emphasis on external amenity provision. The completed development includes a multi-use games area, a padel court, outdoor seating zones, cycle storage and generous yard space, alongside a car park equipped with electric vehicle charging points. These features support both operational needs and future flexibility.

The surrounding landscape has been carefully designed, incorporating wild grass planting, hedgerows and new trees to soften the site and improve environmental integration.

Alan Holland, Chief Executive Officer at DP World London Gateway Logistics Park, commented on the project: “As the London Gateway Logistics Hub continues to grow, we want to ensure the infrastructure around it grows too. With The Hive now complete, we are creating a space where businesses can collaborate, employees can thrive and the local community can develop the skills needed to access new opportunities.

“London Gateway now supports more than 10,000 jobs through on-site employment and its role in the wider economy, and is already home to a growing community of some of the world’s leading businesses. The Hive gives that community a new place to come together. Alongside Thames Freeport, we are investing not only in the physical infrastructure of the site, but in the skills and amenities that will support its growth for many years to come.”

Acting as principal contractor, GOLDBECK delivered the full scheme, including external infrastructure. The Hive now stands as a central hub within the site, bringing together work, wellbeing and community in a single, connected environment.

Featured News

Specification news
Supporting SAP assessments at design stage

Colin Wells, Head of Technical at Keylite Roof Windows (Keylite), discusses how...

Read More >>

Specification news
EDGEMERE 2.0: CUTTING CARBON WITHOUT COMPROMISING ON...

Edgemere 2.0 roof tiles from Marley deliver all the benefits of the acclaimed...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Scandinavian Furniture Thoughtfully Made  Brochure

Scandinavian Furnitu...
By BJELIN

Download Now >>

Fire Rated Loft Ladders  Brochure

Fire Rated Loft Ladd...
By Premier Loft Ladders...

Download Now >>

Flooring Collection 2026 Brochure

Flooring Collection...
By Gerflor

Download Now >>

Housing Brochure Brochure

Housing Brochure
By Gerflor

Download Now >>

CSR Report 2025 Brochure

CSR Report 2025
By Gerflor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

Safeshield INT Reflect AVCL
Safeshield INT Reflect AVCL

Safeshield INT Reflect AVCL is a high-performance air and vapour control layer that boasts class...

Read More >>

Envirotect Class B-s1,d0 Fire Walling Membrane
Envirotect Class B-s1,d0 Fire Walling Membrane

Permavent Envirotect Class B Fire Walling Membrane is a class B-s1,d0 fire rated membrane for use in...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>