Leisure centre improvements take shape

Hotel, Sport & Leisure Tue, Mar 22, 2016 5:05 PM

Leisure centre improvements take shape

Carlisle Leisure Limited (CLL) and Allerdale Borough Council today unveiled a significant improvement programme to the fitness suite and changing facility at the town’s Moorclose Leisure Centre.

The £400,000 project will see significant investment in Male and Female changing facilities and improvements and an extension to the facilities very popular gym which will include two new spaces and an extension to the existing spinning studio.

Councillor Alan Smith, Leader of the Borough Council commented: “Although we are currently looking at the funding and siting of a brand new leisure centre for Workington we recognise that some investment is needed in our current facilities whilst this takes place. We think we have got the balance just right in terms of this investment and that customers old and new will be delighted with what we are going to do.”

Martin Horne, Area Manager for CLL added: “We’re really happy to get these vital improvements under way. Moorclose is an old facility now and we are committed with our partners in Allerdale to helping facilitate a new centre for the region as soon as practicable. In the meantime we have to take action to ensure that existing and hopefully new members get a decent service and good facilities to use whilst we do this work.

“At Moorclose this has been difficult due to the age of the building and the need to get the balance right between investing and maintaining standards versus spending money in what are challenging times.”

The investment is split roughly 50:50 between refurbishment and updating equipment. The refurbishments are being funded by the Borough Council and will be repaid over time from a fund which their Partnership with CLL has enabled. The equipment is being provided by Pulse Fitness in partnership with CLL. Pulse are also designing, managing and building the new and improved spaces.

Chris Johnson Managing Director for Pulse comments on the project: “We are delighted to be working with Carlisle Leisure Limited  and  Allerdale Borough Council on this leisure improvement project utilizing our unique portfolio of services  we have a provided a pro-active solution that includes facility refurbishment, state-of-the-art fitness equipment supply and we are also assisting CLL with some sales and marketing initiatives to support the opening of the new fitness suite. We hope this is the start of a long and prosperous partnership.”

The gym area is being extended upstairs into what used to be the centre’s kitchen to form a light resistance area and the existing spinning room will gain some space from the removal of the old bar area. Downstairs an old meeting room and disused crèche will be made into a bespoke weights and heavy resistance space. The existing weights area and gym space will be joined together and will form a spacious area for cardio equipment, stretching area and notably two new power plates. The amount of exercise stations in the new gym is expected to increase from around 45 to over 70.

The Male and Female dry changing facilities are being gutted and completely refurbished. Martin Horne added: “We’ve been conscious for a while that our dry side changing facilities weren’t really good enough and this investment gives us an opportunity to put that right. We will be reinstating the ventilation systems and replacing vanity units, WC’s, showers and cubicles and redecorating throughout to provide a modern, pleasant refurbishment.”

Work on the improvements has already started and is expected to last 4-6 weeks.

Featured News

Specification news
Three considerations for hotel, gym and leisure...

Specifying shower and wetroom drainage in hotel, gym and leisure facilities requires...

Read More >>

Specification news
Compass Pools: Specifying High-Yield Aquatic...

This content is a sponsored publication provided by Compass Pools, an award-winning...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>