Ashton Gate stand demolition begins

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:13 AM

Ashton Gate stand demolition begins

Demolition of the near 60-year old Williams Stand has started as the third and most complex phase begins of Bristol Sport’s £45m rebuild of Ashton Gate Stadium.

Three phases of work are now underway simultaneously at the home of Bristol City FC and Bristol Rugby:

  • Phase 1 – demolition of the Wedlock Stand, replaced with the new six thousand-seater South Stand
  • Phase 2 - complete remodelling of the Dolman Stand, including complete new lower seating tier and Dolman Conference & Exhibition Hall
  • Phase 3 – demolition of Williams Stand and construction of new eleven thousand-seater, two-tier West Stand.

Bristol Sport chairman Martin Griffiths said: "The redevelopment of Ashton Gate has been a complex project, and just to get to this stage, has been very challenging. As we now enter the final weeks of the construction of the South Stand and the complete refurbishment and modification of the Dolman Stand, demolition of the Williams begins.

“We thank supporters for their patience and really look forward to welcoming everyone back to the new Ashton Gate Stadium at the start of the football and rugby seasons. Given there has been so much change it is going to take a short while for all to get used to their new surroundings, but it remains an exciting time both on and off the pitch."

Mike Henderson, project manager for Barr Construction admitted it is the busiest part of the build: “We’ve started on the main demolition of the old Williams Stand today by taking away the concrete front deck using a hydraulic breaker. Starting at the Atyeo end, we will work along the old Williams Stand and work towards the new South Stand.

“Once that’s completed we will bring in a large ninety-tonne demolition machine which will remove the roof structure and basically take the stand down piece-by-piece to the ground.  

“All the external buildings around the old Williams have now been removed, including the Megastore and Hire Rite building. We will need all of that space to construct this new two-tier stand, which is far bigger than anything else in the stadium. I think everyone will be quite surprised by the actual size of it.”

Fans will be greeted with the new South and Dolman Stands come the start of this 2015/16 season.  The Williams Stand will be completely removed, with new foundations for the West Stand being laid ready for overall completion in July 2016.   

Once finished Ashton Gate Stadium will become the largest conference and events venue in the south-west.

Featured News

Specification news
Oakfield Sports Centre chooses Gerflor and Gradus for...

A new-build sports complex in Jersey is providing high-quality multi-sport...

Read More >>

Specification news
Kalzip Foldables bring handcrafted character and...

Nestled in the heart of County Leitrim, Ireland, Drumhierny Woodland Hideaway has...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Valley Through Range Brochure

Valley Through Range
By Filon Products Limit...

Download Now >>

Safer Replacement Starts Below. Filon Fixsafe. Brochure

Safer Replacement St...
By Filon Products Limit...

Download Now >>

A Smart Way to Refurbish Profiled Roofs. Over-Roofing. Brochure

A Smart Way to Refur...
By Filon Products Limit...

Download Now >>

Site Assembled Rooflights & Specialist GRP Sheets Brochure

Site Assembled Roofl...
By Filon Products Limit...

Download Now >>

Factory-Assembled Multi-Layer GRP Rooflights Brochure

Factory-Assembled Mu...
By Filon Products Limit...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Magply multi-functional board
Magply multi-functional board

Rainscreen CladdingAs a high performance, multi-functional board Magply features a Magnesium...

Read More >>

Magply recovery and protection boards
Magply recovery and protection boards

Magply recovery and protection boards have been developed to meet the roofing industry needs for a...

Read More >>

Safeshield XT Reflect
Safeshield XT Reflect

Safeshield XT Reflect is an A2-s1, d0 fire rated construction membrane for the use in high risk,...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Introducing the all-new weberpral E
Introducing the all-new weberpral E

A high-performance monocouche render with 22% lower carbon emissions from fossil fuels* - helping...

Watch Now >>

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>