Less than one in six firms fully ready for BIM as deadline looms

Hotel, Sport & Leisure Wed, Mar 23, 2016 9:17 AM

Less than one in six firms fully ready for BIM as deadline looms

Fewer than 1 in 6 firms (16%) in the building services sector are ‘fully ready’ to use Building Information Modelling (BIM) on projects, according to new survey findings from the Electrical Contractors’ Association (ECA).

With the government deadline for the mandatory use of ‘BIM Level 2’ in all Whitehall-procured contracts just months away, nearly 6 in 10 firms (57%) said they were not fully ready, while over 1 in 4 (27%) said they were ‘not ready at all’ (please see attached graph).

Yet, despite the above findings, nearly two-thirds of respondents (65%) say that BIM Level 2 will be ‘good for the sector’, while almost 6 in 10 (57%) say it will be the ‘future for building services’.

ECA Director of Business Services Paul Reeve commented: “The survey results show that ‘BIM awareness’ is generally high across building services, but many contractors, and others associated with our sector, still have a long way to go to be ready for the government’s 2016 BIM deadline.

"The results indicate that while some companies have already engaged successfully with BIM, many more have yet to engage with the aspects that allow effective information sharing with others in their supply chain.

"In addition to flagging up our findings to government and the industry, we will be working with our ‘BIM readiness’ partners to tackle the important gaps identified by the survey, as soon as possible.”

The sector-wide ‘BIM readiness’ survey was held in conjunction with the Chartered Institution of Building Services Engineers (CIBSE) and building services and engineering consultancy BSRIA.

CIBSE Technical Director Hywel Davies said: “This survey confirms that whilst there is a growing awareness of Level 2 BIM in the MEP sector, there is still a real need for more information.

“There is also a requirement for specific tools and guidance for the MEP sector, which CIBSE is working closely with industry partners to develop.”

BSRIA's Principal Consultant and BIM specialist John Sands commented: “The figures revealed by the ECA BIM survey show just how much work is still to be done within the building services industry to be ready for Level 2 BIM.

“However, it also demonstrates the positive approach to the changes it will inevitably bring, and that is an important aspect of this survey.”

The survey has attracted sector-wide support, including from SELECT, the Building and Engineering Services Association (B&ES) and BEAMA.

The full results of the survey, which attracted hundreds of responses from contractors and others associated with the sector, will be released shortly.

Featured News

Specification news
Splendid Victorian hotel refit benefits from Conex...

Conex Bänninger products have provided the ideal solution for an extensive...

Read More >>

Specification news
Passivent hits natural ventilation targets for Sport...

Passivent, one of the UK’s leading manufacturers of natural and hybrid ventilation...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Novantica - Cement Free Restoration  Brochure

Novantica - Cement F...
By Fassa Bortolo

Download Now >>

Fassatherm System - Product Catalogue  Brochure

Fassatherm System -...
By Fassa Bortolo

Download Now >>

Fassarend System - Product Catalogue  Brochure

Fassarend System - P...
By Fassa Bortolo

Download Now >>

Fassalime System - Product Catalogue  Brochure

Fassalime System - P...
By Fassa Bortolo

Download Now >>

Sport England’s Performance Archery Centre Brochure

Sport England’s Perf...
By Passivent

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Straightcurve®
Straightcurve®

Straightcurve® – headquartered in Australia, is renowned for high-end innovative garden edging,...

Read More >>

RLG600 Access Flooring System
RLG600 Access Flooring System

The Kingspan RLG600 raised access floor panel is intended for light office use and is capable of...

Read More >>

RHG600 Simploc
RHG600 Simploc

Kingspan RHG600 Simploc is the heavy grade floor system, capable of handling up to a 12kN/m2...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Discover the first-ever reference book for stone wool insulated sandwich panels
Discover the first-ever reference book for stone wool insulated sandwich panels

“Building with stone wool insulated sandwich panels” written by Professor Imperadori, is now...

Watch Now >>

Portakabin | Installation at the iconic Admiralty Arch, London
Portakabin | Installation at the iconic Admiralty Arch, London

Portakabin | Installation at the iconic Admiralty Arch, London

Watch Now >>