Public Sector Tue, Mar 22, 2016 5:33 PM
IBI Group has been announced as preferred bidder with Balfour Beatty to design the £47 million Acute Mental Health and Community development in Scotland.
The new scheme, based in Irvine in North Ayrshire, is located close to the coast on a site surrounded by nature, which provided inspiration for the design concepts.
The team, including IBI’s healthcare design team and landscaping specialists were awarded the scheme following a nine month competitive dialogue process with two other bidders.
The design proposal creates the optimum healing environment for patients and a safe, inspiring working environment for staff. Drawing on best practice and the latest guidance including research from the University of Stirling, the proposal sets new benchmarks in healthcare delivering a high quality modern facility meeting NHS Ayrshire & Arran’s requirements and vision.
“The building layout creates a series of spaces; from the more private areas of the wards, through to sociable shared therapy clusters and onto the more public area within the entrance that faces the wider site and community,” said Martha McSweeney, Lead Architect. “This supports the patient recovery journey, building confidence, offering choice and enabling progression leading up to the transition home.”
The design adopts a holistic view of wellbeing that looks at all the Psychological, Emotional, Physical and Physiological needs. Specific considerations around all of these aspects come together within the design to create the overall therapeutic environment.
All inpatient areas are at ground floor giving ultimate flexibility and equability in the layout, with easy direct access to the outside, embracing nature. Landscaping is integral to the design, with private intimate gardens on the wards, and more sociable spaces such as the cafe terrace and the wider site beyond. A woodland walk creates a pleasant space to enjoy when stepping out of the main entrance, allowing individuals to explore the landscape and pursue longer journeys within the community.
The new facility is on a 6.5Ha site and comprises of outpatient and inpatient facilities with a total of 206 single en-suite beds. There are 90-Older Adult beds for Rehabilitation, Continuing Care and mental health wards for Organic and Function illness. There are 116-Adult mental health beds with facilities for Acute, Rehabilitation, Addictions, Forensics, and Intensive Psychiatric Care.
Featured News
Harmer SML Below-Ground Drainage is a trusted soil and waste system from Alumasc...
As part of Reynaers’ suite of digital solutions, the Access Control Configurator...
BUILDING PRODUCT LIBRARY - LATEST BROCHURES
Master Catalogue
By F.H. Brundle
Paints & Coatings
By F.H. Brundle
Cedral Roofs Brochur...
By Cedral by Etex
Cedral Facades Broch...
By Cedral by Etex
2026 Product Brochur...
By The Radiator Compan...
BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS
Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...
Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...
Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...
CONSTRUCTION VIDEOS - LATEST VIDEOS
Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...
Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...
This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...