First big HS2 contracts revealed

Public Sector Mon, Jul 17, 2017 9:11 AM

The winners of the major construction contracts for Britain’s new railway have been announced, with the £6.6 billion contracts supporting 16,000 jobs across the country.

The huge infrastructure investment covers the main civil engineering work on the first phase of HS2 between London and Birmingham – including construction of tunnels, bridges, embankments and viaducts.

Transport Secretary Chris Grayling announced the decision to award contracts today, which will mean the new high speed link reaching Birmingham by 2026.

David Higgins, Chairman of HS2 Ltd, said: "This is a huge day for the HS2 project and for the country. These contracts will support 16,000 jobs here in Britain and will create opportunities for thousands of SMEs.

"HS2 was always designed to be much more than just a high speed railway and today we can see the opportunities it brings right around the country - spreading prosperity, acting as a catalyst for investment and rebalancing our economy 10 years before the railway even opens. Business now has the surety to invest with confidence to build a legacy for Britain."

The winning bidders to build the first phase of the route are:

Area South

  • Euston Tunnels and Approaches – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)
  • Northolt Tunnels – SCS JV (Skanska Construction UK Ltd, Costain Ltd, STRABAG AG)

Area Central

  • Chiltern Tunnels and Colne Valley Viaduct – Align JV (Bouygues Travaux Publics, VolkerFitzpatrick, Sir Robert McAlpine)
  • North Portal Chiltern Tunnels to Brackley – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)
  • Brackley to South Portal of Long Itchington Wood Green Tunnel – CEK JV (Carillion Construction Ltd, Eiffage Genie Civil SA, Kier Infrastructure and Overseas Ltd)

Area North

  • Long Itchington Wood Green Tunnel to Delta Junction and Birmingham Spur – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement)
  • Delta Junction to WCML Tie-In – BBV JV (Balfour Beatty Group Ltd, VINCI Construction Grands Projets, VINCI Construction UK Ltd, VINCI Construction Terrassement).

HS2 could carry more than 300,000 people a day. And with fast trains using the new line, there will be extra space for more trains on the existing rail network.

Benefits will be felt across the network with trains running as far as Scotland and the number of seats available out of Euston in peak hours more than doubled.

In total, construction of the full HS2 route to the north-west and Yorkshire will create up to 25,000 jobs and 2,000 apprenticeships. Another 3,000 people will operate HS2 and it is estimated that growth around new HS2 stations will create another 100,000 jobs.

In February, Parliament granted powers to construct the Phase One route from London Euston to Birmingham, with the route opening in 2026.

Preparatory works are already underway, with main construction work starting in 2018/19 following a period of detailed design work.

In addition, HS2 stations at Euston, Old Oak Common and in Birmingham will be central to HS2 and the work needed to develop designs is also well underway. Both the invitations to tender (ITTs) for the station design services contracts for all 4 Phase One stations and the invitation to participate in dialogue (ITPD) for the Euston Master Development Partner have been released to shortlisted bidders.

These are significant milestones which show how progress is continuing to deliver stations that will be embraced by the local communities, drive economic growth and provide seamless journeys for passengers.

A series of other HS2 announcements are taking place today.

The Transport Secretary will today publish a Bill to deliver the next phase of HS2, from the West Midlands to the West Coast Main Line south of Crewe.

This means - subject to Parliamentary approval - this part of the route can open in 2027, 6 years earlier than planned, to bring the benefits of HS2 to the north and Scotland sooner.

The Transport Secretary will also confirm the final Phase 2b route, from Crewe to Manchester and Birmingham to the East Midlands and Leeds. This phase will complete HS2 and unlock the transformative project’s full benefits for the country.

Featured News

Specification news
Smarter wastewater design starts here - the DrainMajor...

Modern commercial buildings place increasingly complex demands on building services...

Read More >>

Specification news
Precision performance for modern flooring projects

From large-format porcelain installations to demanding commercial interiors, grout...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Mada ProGuard Brochure Brochure

Mada ProGuard Brochu...
By Magply

Download Now >>

 FIREscape+ Range Overview Brochure

FIREscape+ Range Ov...
By Hochiki Europe (UK)...

Download Now >>

Master Catalogue Brochure

Master Catalogue
By F.H. Brundle

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Cedral Birkdale
Cedral Birkdale

Cedral - Birkdale fibre cement slate has a smooth surface and dressed edges. It offers a traditional...

Read More >>

Cedral Thrutone Smooth
Cedral Thrutone Smooth

Cedral - Thrutone Smooth are a low-profile fibre cement slate that features a smooth surface and...

Read More >>

Cedral Rivendale
Cedral Rivendale

Cedral - Rivendale slates are designed to reflect the qualities of natural slate. Available in...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>